Laserfiche WebLink
amec,O <br />ATTACHMENT A <br />2011 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name APR 17 APR 18 APR 19 APR 20 APR 21 APR 22 APR 23 <br />Joseph Hickey - PR PR PR PR PR - <br />Uwe Kelley - ST ST ST ST ST - <br />Ben Melly - LG LG LG LG LG <br />John Lupo - - - PCE - - - <br />Kim Morrison - <br />Jay Moore - - - PM <br />'Night Shin <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/Laboratory Manager <br />SE = Senior Engineer <br />VLF Weekly Report WE 04.23.2011