s <br />s, <br />amec'0 <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed slope contouring of the Phase 5 VLF slopes. <br />AMEC observed and inventoried geomembrane delivered to site. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue slope contouring within the Phase 5 VLF. <br />Continue receiving geomembrane to site. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />CC&V held a Pre-construction meeting on April 12, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Jay Moore (AMEC) and Kim Morrison (AMEC) were onsite to attend the Pre-construction meeting and to <br />observe project activities. <br />AMEC personnel performed an inspection of the Phase 5 construction activities with Timm Commer <br />(CC&V) and Berhan Keffelew (DRMS). No issues were encountered during the inspection. <br />Ames Construction: <br />None <br />AMEC: <br />None <br />Other: <br />None <br />VLF Weekly Report WE 04.16.2011