<br />amec(O <br />D) Soil Liner Fill <br />1) VLF <br />No work performed during the week. <br />E) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />No placement performed during the week. <br />2) Drain Cover Fill (DCF) <br />No work performed during the week. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />No Drain Cover Fill (DCF) was processed during the week. <br />Location This Week Cumulative Comments <br /> (tons) tons <br />DCF Process 0 121,223 <br />Total 0 121,223 <br />IV)VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />No work performed during the week. <br />B) Anchor Trench <br />1) VLF <br />No work performed during the week. <br />C) Geomembrane Acceptance <br />1) VLF <br />No geomembrane was accepted during the week. <br />D) Geomembrane Delivery <br />1) VLF <br />Four loads (44 rolls) of 80mi1 LLDPE single sided textured geomembrane rolls were delivered <br />to site during the week. The loads were delivered on a flat bed truck in good condition. The <br />rolls were unloaded using a CAT 950 front-end loader with forks attached. The geomembrane <br />was placed on three pieces of HDPE pipe, stacked two rolls high. An AMEC field <br />representative inventoried the geomembrane and was present at all times during unloading of <br />the geomembrane. <br />VLF Weekly Report WE 04.16.2011