My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-02_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-05-02_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:12 PM
Creation date
5/6/2011 1:22:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
5/2/2011
Doc Name
Proposed Decision & Findings of Compliance for SL4
From
Phase I/II -494.2 acres Phase I, 420.9 acres Phase II
Type & Sequence
SL4
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLES <br />Table 1 - Summary of SL-04 Bond Release Amounts <br />Task Cost <br /> <br />East Pit Topsoil Replacement $ 1,487,351 <br />West Pit Topsoil Replacement $ 272,730 <br />Section 16 Pit Topsoil Replacement $ 25,638 <br /> <br />East Pit Reseeding $ 291,750 <br />West Pit Reseeding $ 35,468 <br />Section 16 Pit Reseeding $ 14,085 <br /> <br /> <br />Subtotal $ 2,127,022 <br /> <br /> <br />INDIRECT COSTS <br /> <br />Overhead and Profit <br />Liability Insurance (1.55% of Direct Costs) $ 32,969 <br />Performance Bond (1.05% of Direct Costs) $ 22,334 <br />Job Superintendent (at $52.10/hour) $ 10,530 <br />Profit (10.00% of Direct Costs) $ 212,702 <br /> <br />Total Overhead and Profit $ 2,405,557 <br /> <br />Contract Amount (Direct Costs + Overhead and Profit) <br />Leeal - Engineering - Project Management <br />Engineering Work and Contract/Bid Preparation (4.25% of Contract) $ 102,236 <br />Reclamation Management and Administration (3.25% of Contract) $ 78,181 <br /> <br /> <br /> <br />Total Bond Release $ 2,585,974 <br /> <br />Current Bond Held $ 83,156,939 <br /> <br /> <br />Bond Remaining AFTER SL-04 $ 80,570,965 <br />Proposed Decision and Findings of Compliance 2 May 2011 <br />Partial Phase 1/11 Bond Release SL-04 Page 15
The URL can be used to link to this page
Your browser does not support the video tag.