My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-04_REVISION - M1996079
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996079
>
2011-05-04_REVISION - M1996079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:15 PM
Creation date
5/5/2011 2:14:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996079
IBM Index Class Name
Revision
Doc Date
5/4/2011
Doc Name
Adequacy Review-02
From
DRMS
To
Barnard Quarries
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 2 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 5/3/2011 County: Boulder <br />User: MAC <br />Agency or organization name: DRMS <br />SCRAPER TEAM WORK <br />Task description: Replacing Topsoil <br />Site: Barnard Quarry Permit Action: AM-01 Permit/Job#: M1996079 <br />HOURLY EQUIPMENT <br />-Scraper: Cat 621G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Scraper Work Team Snnnort Eauipment Maintenance Eauipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $46.12 NA NA NA NA NA <br />Operating cost/hour: $97.04 NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $38.67 NA NA NA NA NA <br />Unit Subtotals: $181.83 NA NA NA NA NA <br />Number of Units: 1 0 0 0 0 0 <br />Group Subtotals: Work: $181.83 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $181.83 <br />MATERIAL OUANTITIES <br />Initial volume: 7,986 CCY Swell factor: 1.000 <br />Loose volume: 7,986 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 1,600 lbs/LCY <br />Material description: Top Soil <br />Rated Payload: _48,020j?ounds <br />Payload Capacity: 30.00 LCY <br />Abbreviation: None <br />Filename: M079-002 <br />COSTShift basis: 1 per day <br />Struck Volume: 15.70 LCY <br />Heaped Volume: 22.00 LCY <br />Average Voh.lme: 18.85 LCY <br />Adjusted Capacity: 18.85 LCY <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.