Laserfiche WebLink
Loader Worksheet Cont'd Task # TTT <br />Total Travel Time: 0.3305 <br />Total Cycle Time: 0.9205 <br />Load Bucket Capacity <br />Rated Capacity: 4.20 LCY (heaped) <br />Bucket Fill Factor: 1.025 Rock - Earth Mixture (100%-105%) 1.025 <br />Adjusted Capacity: 4.31 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6000 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 280.60 <br />Adjusted Hourly Unit Production: 232.90 <br />Adjusted Hourly Fleet Production: 465.79 <br />JOB TIME AND COST <br />Fleet size: 2 Loader(s) Total job time: <br />Unit cost: $0.399 /LCY Total job cost: <br />Page 2 of 2 <br />minutes <br />minutes <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />42.94 Hours <br />$7,976.00 <br />CIRCES Cost Estimating Software