My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-04_REVISION - C1983059
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1983059
>
2011-05-04_REVISION - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:17 PM
Creation date
5/5/2011 9:30:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
REVISION
Doc Date
5/4/2011
Doc Name
2011 Midterm Review Adequacy Review Letter
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
MT6
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # 015 Page 4 of 5 <br />Crusher to Secondary 80 LF Conveyor, overland, 80.00 LF $16.71 $1,336.80 <br />Conveyor including supports - 5 <br /> ft. W x 6 ft. H housing <br />Secondary to 46 LF Conveyor, overland, 46.00 LF $16.71 $768.66 <br />Transfer Conveyor including supports - 5 <br /> ft. W x 6 ft. H housing <br />Reclaim Conveyor 60 LF Conveyor, overland, 60.00 LF $16.71 $1,002.60 <br /> including supports - 5 <br /> ft. W x 6 ft. H housing <br />Reclaim to Transfer 100 LF Conveyor, overland, 100.00 LF $16.71 $1,671.00 <br />Conveyor including supports - 5 <br /> ft. W x 6 ft. H housing <br />Transfer to Loadout 100 LF Conveyor, overland, 100.00 LF $16.71 $1,671.00 <br />Conveyor including supports - 5 <br /> ft. W x 6 ft. H housing <br />- Conveyor Footings 2'xFx14 LF Demo. and on-site 14.00 LF $6.43 $90.02 <br /> disposal in excavated <br /> pit, 1.0 ft. x 2 ft. - Max, <br /> 200 ft. push <br />Railroad Track 1,650 LF Railroad track - Ties 1,650.00 LF $8.57 $14,140.50 <br /> and track <br />- Ballast 1,100 CY Railroad track - Ballast 1,100.00 CY $4.12 $4,532.00 <br />Substation Fencing 164 LF Fencing, chain link, 164.00 LF $2.74 $449.36 <br /> including posts and <br /> fabric - 8 ft. to 10 ft. <br /> high <br />Retaining Wall 272'x7.5'xl2" Demo. and on-site 2,040.00 SF $3.54 $7,221.60 <br /> disposal in excavated <br /> pit, 12 in. thick - Max. <br /> 200 ft. push <br />- Footing 1'x2'x128 LF Demo. and on-site 128.00 LF $6.43 $823.04 <br /> disposal in excavated <br /> pit, 1.0 ft. x 2 ft. - Max. <br /> 200 ft. push <br />Concrete Sump 36.5'x36.5x6" Demo. and on-site 1,332.00 SF $1.61 $2,144.52 <br /> disposal in excavated <br /> pit, 6 in. thick - Max. <br /> 200 ft. push <br />Powerlines and Poles 1,115 LF Powerline or telephone 1,115.00 LF $2.60 $2,896.77 <br /> line, overhead, wood - <br /> Single pole <br />Coal Loadout Bin 10'x6'x12' Bldg. (SN) demo./on- 720.00 CF $0.17 $123.12 <br /> site disposal in <br /> excavated pit - Max. <br /> 200 ft. push <br />Road Pavement 300'x24'x6" Pavement, bituminous, 800.00 SY $6.41 $5,128.00 <br /> demolition only - 4 in. <br /> to 6 in. thick <br />- Guard Rails 1,140 LF Railing, roadside 1,140.00 LF $11.04 $12,585.60 <br /> guiderail and posts <br /> (posts on 20 ft. centers) <br />Stoker Oil Building 10'x10'xl 10' Bldg. (SN) demo./on- 1,000.00 CF $0.17 $171.00 <br />Expansion site disposal in <br /> excavated pit - Max. <br /> 200 ft. push <br />- Pad 10'x 10'x4" Demo. and on-site 100.00 SF $1.07 $107.00 <br /> disposal in excavated <br /> pit, 4 in. thick - Max. <br /> 200 ft. push <br />C[RCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.