Laserfiche WebLink
Demo Worksheet Cont'd Task # 015 Page 3 of 5 <br />- Pad 12'x10'x8" Demo. and on-site 120.00 SF $2.14 $256.80 <br /> disposal in excavated <br /> pit, 8 in. thick - Max. <br /> 200 ft. push <br />Secondary Screener 36'x9'xl4' Bldg. (MN) demo./on- 4,536.00 CF $0.20 $898.13 <br /> site disposal in <br /> excavated pit - Max. <br /> 200 ft. push <br />- Pad 40'xl4'x8" Demo. and on-site 560.00 SF $2.14 $1,198.40 <br /> disposal in excavated <br /> pit, 8 in. thick - Max. <br /> 200 ft. push <br />Secondary Stacker to 110'x3'x30' Bldg. (MN) demo./on- 9,900.00 CF $0.20 $1,960.20 <br />Reclaim site disposal in <br /> excavated pit - Max. <br /> 200 ft. push <br />- Footing 1.5'x3'x50 LF Demo. and on-site 50.00 LF $14.47 $723.50 <br /> disposal in excavated <br /> pit, 1.5 ft. x 3 ft. - Max. <br /> 200 ft. push <br />Secondary Stacker to 100'x3'x10' Bldg. (MN) demo./on- 3,000.00 CF $0.20 $594.00 <br />Pile site disposal in <br /> excavated pit - Max. <br /> 200 ft. push <br />- Footing 1.5'x3'x50 LF Demo. and on-site 50.00 LF $14.47 $723.50 <br /> disposal in excavated <br /> pit, 1.5 ft. x 3 ft. - Max. <br /> 200 ft. push <br />Primary Stacker to 100'x3'x10' Bldg. (MN) demo./on- 3,000.00 CF $0.20 $594.00 <br />Lump Pile site disposal in <br /> excavated pit - Max. <br /> 200 ft. push <br />- Footing 1.5'x3'x50 LF Demo. and on-site 50.00 LF $14.47 $723.50 <br /> disposal in excavated <br /> pit, 1.5 ft. x 3 ft. - Max. <br /> 200 ft. push <br />Truck Dump 24'x18'x14' Bldg. (MN) demo./on- 6,048.00 CF $0.20 $1,197.50 <br /> site disposal in <br /> excavated pit - Max. <br /> 200 ft. push <br />CMP #2 12"x25 LF Pipe, corrugated metal 25.00 LF $2.19 $54.75 <br /> (CMP) - 12 in. <br /> diameter pipe <br />CMP #3 and CMP #4 18"x95 LF Pipe, corrugated metal 95.00 LF $2.34 $222.30 <br /> (CMP) - 18 in. <br /> diameter pipe <br />Principle Spillway at 12"x80 LF Pipe, corrugated metal 80.00 LF $2.19 $175.20 <br />Sediment Pond (CMP) - 12 in. <br /> diameter pipe <br />Truck Dump to 180 LF Conveyor, overland, 180.00 LF $16.71 $3,007.80 <br />Primary Conveyor including supports - 5 <br /> ft. W x 6 ft. H housing <br />Primary to Secondary 80 LF Conveyor, overland, 80.00 LF $16.71 $1,336.80 <br />Conveyor including supports - 5 <br /> ft. W x 6 ft. H housing <br />Primary to Transfer 100 LF Conveyor, overland, 100.00 LF $16.71 $1,671.00 <br />Conveyor including supports - 5 <br /> ft. W x 6 ft. H housing <br /> <br />CIRCES Cost Estimating Software