Laserfiche WebLink
V <br />v <br />A. Daniels - LeCompte - Wagner - Well No. 1. <br />Location of well: In the NEa of the SEa of Sec. <br />3, T. 15S., R. 66W. being at a point 1015.6 feet <br />West of the Last line of said Quarter Section, <br />and 1256 Feet North of the South line thereof. <br />B. Daniels - LeCompte - Wagner Well No. 2. <br />Location of well: In the NEa of the SEw' of Sec. <br />3, T. 15S., It. 66W., being at a point on the South <br />line thereof 1015 feet ?lest of the East line of <br />said Quarter Section and North 14 degs. 57' West <br />of said point a distance of 371 feet. <br />C. Daniels - LeCompte - Wagner Well No. 3. <br />Location of well: In the NEa of the SEa of <br />Section 3, T. 15S., R. 66W, at a point 910.6 feet <br />West of the East line of said Quarter Section, <br />and 75 feet North of the South line thereof. <br />All of the above Decreed in this court in case No. W559. <br />2. That the Applicant seeks approval of a Plan of Augmentation <br />wherein the applicant will replace depletions to the Fountain River System which <br />will result from all of its pumping of said wells whose Decrees are junior, and the <br />use of water therefrom in its gravel production and Transit Mix Concrete <br />operations. <br />3. That the Applicant has acquired or will acquire before this Decree <br />becomes effective or allows pumping of said wells, 104 shares of Fountain Mutual <br />Irrigation stock giving it an entitlement to the production of water represented by <br />said shares for uses in this Augmentation Plan. To assure that no injury results to <br />the Fountain Mutual Ditch Company deliveries to the Applicant will be reduced by <br />5%. This water will be left in the Ditch for the benefit of other water uses under <br />the Ditch. The water produced by said shares will not be used for the irrigation of <br />any lands previously irrigated and that portion delivered to the Applicant will be <br />released to the fulfillment of the requirements of this Augmentation Plan at one of <br />the following locations to replenish the stream's depletions and the aquifer. <br />A. At a structure to be constructed in the Fountain Mutual <br />Ditch at a location in the NEa of Sec 3 Township 15S Range 66W of the 6th P.M. <br />on the Applicant's property where the water will be discharged into a pond located <br />on the Applicant's property near the location of Faid wells and allowed to seep and <br />return to the aquifer and the river as replacements for the net depletions caused by <br />-2- <br />