Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Reclamation Cost Estimate <br />Site: Upper Mountain Top Permit Action: New NOI <br />PROJECT IDENTIFICATION. <br />Task #: 000 State: Colorado <br />Date: 4/26/2011 County: Ouray <br />User: RCO <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br /> <br />Task <br /> <br />Description Form <br /> <br />Used Fleet <br /> <br />Size Task <br /> <br />Hours <br /> <br />Cost <br />001 Remove and dispose of site debris DEMOLISH 1 0.00 $552.67 <br />002 Minor ad and drainage shaping EXCAVATE 1 1.75 $120.00 <br />003 Haul reclamation equipment to and from site MOBILIZE 1 8.00 $1,476.87 <br /> SUBTOTALS: 9.75 $ $2,149.54 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $43.42 <br />Performance bond: 1.05 Total = $22.57 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $214.95 <br /> TOTAL O & P = $280.94 <br />CONTRACT AMOUNT (direct + O & P) = $2,430.48 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 Total = $0.00 <br />Reclamation management and/or administration: 5.00 $121.52 <br />CONTINGENCY: 0.00 Total = $0.00 <br />` TOTAL INDIRECT COST = $402.46 <br />TOTAL BOND AMOUNT (direct + indirect) = $2,552.00 <br />Permit/Job#: P2011003 <br />Abbreviation: None <br />Filename: P003-000