Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Distribute <br />Site: Dick Casey Concr Pit <br />Permit Action: 2011 Midterm Review <br />PROJECT IDENTIFICATION <br />Task #: 006 State: <br />Date: 4/18/2011 County: <br />User: DMC <br />Colorado <br />Garfield <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9U (2005) <br />Horsepower: 405 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $49.19 NA <br />Operating Cost/Hour: $110.89 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $397.14 <br />MATERIAL QUANTITIES <br />Initial Volume: 27,750 <br />Swell factor: 1.000 <br />Loose volume: 27,750 LCY <br />Source of estimated volume: 34.4 acres at 6" depth (TR3) <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,308.1 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: 0% <br />Average site altitude: 5,320 feet <br />Material weight: 1,600 lbs/LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Permit/Job#: M1978349 <br />Abbreviation: None <br />Filename: M349-006 <br />CIRCES Cost Estimating Software