Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 005 Page 3 of 3 <br />Seg # v^ Haul Distance Grade (%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br />1 1000.00 0.00 4.00 4.00 2665 0.473 <br />n _ U -+., <br />Haul Time: 0.473 <br />minutes <br /> Seg # ^Haul Distance <br />(Ft) Grade (%) Roll. Res <br />(%) Total Res <br />(%) Velocity <br />(fpm) el <br />e <br />T <br /> 1 1000.00 0.00 4.00 4.00 2849 7 <br />O. <br /> <br /> <br />e: 0.377 <br />Return Tim <br />minutes <br /> Total Truck Cycle Time: 2.918 minutes <br />Loading Tool unit <br />Production 550.72 LCY/Hour Adjusted for job efficiency: 457.09 LCY/Hour <br />Truck Unit Production <br /> 220.49 LCY/Hour Adjusted for job efficiency: 183.01 LCY/Hour <br />Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 366.02 LCY/Hour <br /> Adjusted single truck/loader team production: 366.02 LCY/Hour <br /> Adjusted multiple truck/loader team production: 732.03 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 <br />Unit cost: $0.497 <br />Team(s) Total job time: 37.91 Hours <br />/LCY Total job cost: $13,781.52 <br />CIRCES Cost Estimating Software