Laserfiche WebLink
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Transport topsoil from stockpiles <br />Site: Dick Casey Concr Pit Permit Action: 2011 Midterm Review Permit/Job#: M1978349 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado Abbreviation: None <br />Date: 4/18/2011 County: Garfield Filename: M349-005 <br />User: DMC <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />Truck Loader Team -Truck: Generic 10-12 cy, 6x4 <br />-Loader: CAT 972G (2002) <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: NA <br />-Water Truck: NA <br />Q......nrhFrniinmant MnintenanceF.auinment <br />VVSl 17Ivanu V"... iau..av ,?..,. <br />Truck ...... i........ <br />Loader --"rr ---- <br />Load Area -- <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization-machine: 100 100 NA NA NA NA <br />Ownership cost/hour: $12.25 $27.23 NA NA NA NA <br />Operating cost/hour: $49.41 $51.19 NA NA NA NA <br />Ripper op. cost/hour: NA $0.00 NA NA NA NA <br />Operator cost/hour: $0.00 $38.49 NA NA NA NA <br />Unit Subtotals: $61.66 $116.91 NA NA NA NA <br />Number of Units: 4 1 0 0 0 0 <br />Group Subtotals: Work: $363.55 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $363.55 <br />MATERIAL QUANTITIES <br />Initial volume: 27,750 CCY Swell factor: 1.000 <br />Loose volume: 27,750 LCY <br />Source of estimated volume: 34.4 ac. at 6" depth (TR3) <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 Pounds/LCY <br />Description: Top Soil <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 22.13 LCY <br />CIRCES Cost Estimating Software