My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-19_INSPECTION - M1978349
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1978349
>
2011-04-19_INSPECTION - M1978349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:42 PM
Creation date
4/26/2011 9:28:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978349
IBM Index Class Name
INSPECTION
Doc Date
4/19/2011
Doc Name
Inspection report
From
DRMS
To
Oldcastle SW Group, Inc.
Inspection Date
4/7/2011
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip process area <br />Site: Dick Case Concr Pit Permit Action: 2011 Midterm Review Permit/Job#: M1978349 <br />y <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 4/18/2011 County: Garfield <br />User: DMC <br />Seismic: <br />Area: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9U (2005) Horsepower: 405 <br />Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $57.16 NA <br />Operating Cost/Hour: $110.89 100 <br />Ripper Operating Cost/Hour: $7.05 100 <br />Operator Cost/Hour: $38.49 NA <br />Total Unit Cost/Hour: $213.59 <br />Total Fleet Cost/Hour: $427.17 <br /> <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />NA Bank Volume: NA BCY NA <br />11 acres Rip Depth (ft): <br />Source of estimated quantity: Rec. <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />2.00 Volume: 34,848 BCY or CCY <br />NA feet/second <br />Area: <br />Average Ripping Depth: <br />2.00 <br />mph <br />Average Ripping Width: 7.67 degrees <br />Average Ripping Length: 500.00 feet <br />Average Dozer Speed: 88.00 feet <br />Average Maneuver Time: 0.25 feet <br />Production per unit area: 0.891 acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.891 Acres/hr <br />Site Altitude: 5,320 feet . <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.74 Acres/hr <br />Adjusted Hourly Fleet Production: 1.48 Acres/hr <br />JOB TIME AND COST <br />Fleet size: 2 Grader(s) Total job time: 7.31 <br />Unit cost: $288.976 Per acre <br />Total job cost: $3,121.00 <br />Hours <br />CIRCES Cost Estimating Software <br />Abbreviation: None <br />Filename: M349-004
The URL can be used to link to this page
Your browser does not support the video tag.