Laserfiche WebLink
March 30, 2011 C-1981-015/Fruita No 1 &2 SB 1 <br /> HYDROLOGIC BALANCE -Rule 4.05❑ Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5, <br /> 4.05.6; Discharge Structures 4.05.7,4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br /> Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage—Acid and Toxic Materials 4.05.8; <br /> Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> The main channel draining the upper portal and bench areas is stable. There are some gullies adjacent to <br /> the channel,but the main rip rapped channel has little erosion. <br /> The reconstructed rip rapped pond outlet is functioning well. Little or no erosion was observed in that charnel. <br /> ROADS—Rule 4.0311 Construction 4.03.1(3)/4.03.2(3)❑ Drainage 4.03.1(4)/4.03.2(4)❑ Surfacing and <br /> Maintenance4.03.1(5) and(6)/4.03.2(5)and(6)❑ Reclamation 4.03.1(7)/4.03.2(7): <br /> The reclaimed road blends in well with the adjacent landscape. The surface roughening that was done <br /> during reclamation is leveling out and there is a well established vegetation cover. <br /> DOCUMENTS RECEIVED <br /> OTHER(SPECIFI) <br /> No enforcement actions were taken during this inspection. <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 3 <br />