Laserfiche WebLink
COST SUMMARY WORK <br />Task description: <br />Site: Elk Creek Mine <br />PROJECT IDENTIFICATION <br />Task #: OOG State: Colorado <br />Date: 19-Apr-11 County: Delta <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description Form <br />Used Fleet <br />Size Task <br />Hours <br />Cost <br />090 Replace Topsoil from Stockpile to Previously Disturbed <br />Elk A SCRAPERI 1 1.91 $1,173.69 <br />091 Replace Topsoil from Stockpile to Sanborn Creek Areas SCRAPERI 1 13.14 $8,075.26 <br />092 Replace Topsoil from Stockpile to East Refuse Area SCRAPERI 1 5.07 $3,116.73 <br />093 Replace Topsoil from Stockpile to West Valle Fill Area SCRAPERI 1 27.87 $17,128.35 <br />094 Replace Topsoil from Stockpile to II-West Refuse Pile SCRAPERI 1 5.80 $3,561.97 <br />095 Replace Topsoil from Stockpile to It West Refuse Pile <br />Road SCRAPERI 1 1.09 $670.26 <br />096 Replace Topsoil from Stockpile to Expanded Elk Creek <br />Mine Fa DOZER 3 0.13 $103.00 <br />097 Replace Topsoil from Stockpile to Substation No. 3 DOZER 3 1.14 $876.44 <br />098 Replace Topsoil from Stockpile to Elk Creek Mine Area SCRAPERI 1 18.89 $11,611.84 <br />099 Replace Topsoil from Stockpile to CBM-15 Drill Pad DOZER 3 0.25 $188.38 <br />100 Replace Topsoil from Stockpile to Drill Pads from MR's <br />and T DOZER 3 30.75 $23,554.85 <br />101 Replace Topsoil from Stockpile to Light Use Road to <br />CBM-15 DOZER 3 0.28 $215.95 <br />102 Replace Topsoil from Stockpile to Light-Use Roads <br />from MR's DOZER 3 29.84 $22,860.99 <br />103 Replace Topsoil from Stockpile to Pond F, Ditches and <br />Plunge DOZER 1 2.86 $729.35 <br />SUBTOTALS: 139.02 $93,867.06 <br />Topsoil Replacement Tasks <br />Permit Action: 2011 Midterm Review <br />(MT-06) Petmit/Job#: C1981022 <br />Abbreviation: None <br />Filename: C022-OOg