My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-19_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2011-04-19_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:43 PM
Creation date
4/20/2011 9:10:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
4/19/2011
Doc Name
2011 Midterm Review Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
MT6
Email Name
JRS
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Elk Creek Mine <br />PROJECT IDENTIFICATION <br />Task #: OOF State: Colorado <br />Date: 19-Apr-11 County: Delta <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br /> <br />Task <br /> <br />Description Form <br /> <br />Used Fleet <br /> <br />Size Task <br /> <br />Hours <br /> <br />Cost <br />060 Reconstruct/Ri ra Lower Hubbard Creek EXCAVATE 1 6.48 $30,440.25 <br />061 Excavate for Lower Hubbard Creek Ri ra Placement EXCAVATE 1 12.79 $1,784.00 <br />062 Reconstruct/Ri ra Bear Canyon EXCAVATE 1 3.50 $16,430.40 <br />063 Excavate for Bear Creek Ri ra Placement EXCAVATE 1 1.89 $264.00 <br />064 Reconstruct/Ri ra Elk Creek EXCAVATE 1 58.44 $274,329.00 <br />065 Excavate for Elk Creek Ri ra Placement EXCAVATE 1 278.57 $38,831.00 <br />066 Remove Upper Hubbard Creek Sediment Pond DOZER 1 2.99 $762.27 <br />067 Re grade East Bench Pond DOZER 1 0.61 $154.93 <br />068 Excavate/Backfill Pond C Wall Area EXCAVATE 1 2.32 $324.00 <br />069 Re grade West Valle Fill Diversion EXCAVATE 1 2.52 $353.00 <br />070 Remove Sanborn Creek Ditches (CD-1, 2, 3, 4, 5 and <br />CD-A) DOZER 1 1.46 $371.84 <br />071 Remove Sewage Leach Field DOZER 1 0.61 $154.85 <br />072 Re grade Pond A DOZER 1 0.61 $154.93 <br />073 Re de Pond B DOZER 1 26.02 $6,642.71 <br />074 Re de Pond D DOZER 1 42.69 $10,901.26 <br />075 Re grade Pond E DOZER 1 4.39 $1,119.94 <br />076 Remove Gravel from Substation No. 3 to Sediment Pond DOZER 3 0.37 $279.86 <br />077 Re grade Pond F DOZER 1 2.26 $576.15 <br />078 Re grade Ditches at Hubbard Creek Fan Site DOZER 1 0.81 $205.57 <br />SUBTOTALS: 449.33 $384,079.96 <br />COST SUMMARY WORK <br />Drainage Control Installation and Removal Tasks <br />Permit Action: 2011 Midterm Review <br />(MT-06) Permit/Job#: C1981022 <br />Abbreviation: None <br />Filename: C022-00f
The URL can be used to link to this page
Your browser does not support the video tag.