My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-19_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2011-04-19_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:43 PM
Creation date
4/20/2011 9:10:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
4/19/2011
Doc Name
2011 Midterm Review Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
MT6
Email Name
JRS
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: <br />Site: Elk Creek Mine <br />Backfilling and Rough Grading Tasks <br />Permit Action: 2011 Midterm Review <br />(MT-06) Permit/Job#: C1981022 <br />PROJECT IDENTIFICATION <br />Task #: OOA State: Colorado <br />Date: 19-Apr-11 County: Delta <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description Form <br />Used Fleet <br />Size Task <br />Hours <br />Cost <br />001 Backfill and Re grade Elk Creek Facilities Area DOZER 3 292.02 $223,686.32 <br />002 Backfill and Re grade Sanborn Creek Facilities Area DOZER 3 9.01 $6,898.96 <br />003 Backfill and Regrade Substation No. 3 Pad and Sediment <br />Pond DOZER 3 1.33 $1,021.98 <br />004 Backfill and Grade Material Used to Widen Access <br />Road DOZER 3 1.53 $1,174.80 <br />005 Backfill and Re grade Elk Creek Mine Area DOZER 3 113.19 $86,706.59 <br />006 Move Fill Material from Elk Creek Mine to Elk Creek <br />Facility SCRAPERI 1 152.01 $93,424.01 <br />007 Backfill and Regrade CBM-15 Drill Pad DOZER 3 0.53 $407.28 <br />008 Backfill and Re grade Prima Ri ra Borrow Area DOZER 3 4.75 $3,642.14 <br />009 Backfill and Re grade Secondary Ri ra Borrow Area DOZER 3 12.05 $9,226.75 <br />010 Backfill and Regrade Elk Creek Mine Rock Safety Catch <br />Bench DOZER 3 23.52 $18,019.36 <br />Oil Backfill and Re grade Temporary Conveyor Corridor DOZER 3 11.87 $9,094.17 <br />012 Re grade Expanded Elk Creek Mine Fan Bench DOZER 3 1.06 $808.92 <br />013 Re grade Drill Pads Associated with MR's and TR's DOZER 3 85.91 $65,807.96 <br />SUBTOTALS: 708.78 $519,919.24 <br />Abbreviation: None <br />Filename: C022-00a
The URL can be used to link to this page
Your browser does not support the video tag.