My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-20_REVISION - C1982056 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2011-04-20_REVISION - C1982056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:45 PM
Creation date
4/20/2011 9:10:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
4/20/2011
Doc Name
Email Regarding Attached County Emergency Approval
From
Jerry Nettleton
To
DRMS
Type & Sequence
MR253
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7--% <br />ROUTT <br />Board of County Commissioners <br />Pa Box 773598 <br />Steamtroat Springs. CO 80477 <br />970 879-0108 <br />fax 9701879-3992 <br />Permit No.: <br />Project Name: <br />Owner: <br />Address: <br />Type of Use: <br />Location/Legal Description: <br />Period of Permit: <br />Board Approval Date: <br />Conditions of Approval: <br />SPECIAL USE PERMIT <br />EMERGENCY APPROVAL <br />Routt County, Colorado <br />Temporarily Amends PP2009-008 <br />Twentymile Coal Mine Temporary Stability Bore <br />Holes, Drill Pad, and Accessory Uses <br />Peabody Coal Company <br />29515 Routt County Road 27 <br />Oak Creek, CO 80467 <br />Mining and Associated Uses <br />Northwest % Southwest % Section 23, Township 5 <br />North, Range 87 West (see attached map) <br />Operations by MaJUne 15, 2011 <br />Reclamation by October 31, 2011 <br />April 19, 2011 <br />1. This permit temporarily amends Permit #PP2009-008 for the uses and structures at <br />the pad site. All other conditions of PP2009-008 shall continues to apply. <br />2. Uses covered under this permit shall include: <br />? Construction of a short access road from RCR27 and a 200 x 300 foot drill pad <br />? Drilling and casing of 2 13-inch diameter boreholes to a depth of approximately <br />1,425 feet <br />? Installation of a temporary concrete batchplant on the existing 18-Left Shaft Pad <br />or the hauling of concrete to the temporary pad site <br />? Extension of a temporary concrete transfer line from the batchplant to the <br />boreholes (if needed) <br />COUNTY
The URL can be used to link to this page
Your browser does not support the video tag.