Laserfiche WebLink
Table of Contents <br />7.0 MONITORING & RECLAMATION ACTIVITIES PLANNED FOR 2011 <br />8.0 REFERENCES <br />Tables <br />Table 1 Summary of Annual Slope Displacement for 2009-10 <br />Table 2 Spring and Seep Summary of Activity (1995-2009) <br />Figures <br />Figure 1 Site Location Map <br />Figure 2 2008 Reclamation Areas <br />Figure 3 Site Layout with Monitoring Stations <br />Figure 4 Water Level Elevation Data <br />Figure 5 Hydrograph of Pinnacle Adit Discharge <br />Figure 6 Pinnacle Adit Discharge <br />Appendices <br />A Slope Displacement Vectors <br />B Letter of Surety <br />CD Pocket <br />1 PDF version of 2010 Annual Reclamation Report <br />2 2010 Sediment Embankment Report <br />3 2010 RML Annual Letter <br />29 <br />30