Laserfiche WebLink
Table of Contents <br />EXECUTIVE SUMMARY 1 <br />1.0 INTRODUCTION 3 <br /> 1.1 Terms and Conditions 3 <br /> 1.2 Purpose and Scope of Work 3 <br /> 1.3 Project Description 3 <br />2.0 LAND DISTURBED IN 2010 4 <br />3.0 RECLAMATION ACTIVITIES IN 2010 5 <br /> 3.1 Constructed Wetlands Area and Adjacent Slope 5 <br /> 3.2 Tie Camp Creek Disposal Cell 6 <br /> 3.3 Erosion Control in the North and South Pits and Waste Rock dumps 6 <br />4.0 MONITORING AND ANNUAL REPORTING 16 <br /> 4.1 Slope Movement Vector Analysis 16 <br /> 4.2 Inclinometer Evaluation 18 <br /> 4.3 Pinnacle Mine Workings Monitoring 19 <br /> 4.3.1 Spring and Seep Monitoring 20 <br /> 4.3.2 Groundwater Levels 20 <br /> 4.3.3 Pinnacle Adit Flow 22 <br /> 4.3.4 Radium and Uranium Concentrations at PP-01 22 <br /> 4.4 Sediment Control Embankment 23 <br /> 4.5 Waste Rock Dumps 24 <br /> 4.6 Water Quality Monitoring 25 <br /> 4.7 Radioactive Materials License 26 <br />5.0 INSPECTIONS 27 <br />6.0 SURETY 28