Laserfiche WebLink
Pagel of 2 <br />BULLDOZER WORK <br />Task description: Replace Topsoil from Stockpile Last Chance Pond <br />Site: Deserado Mine Permit Action: Technical Revision 68 Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 216 State: Colorado <br />Date: 11-Apr-11 County: Rio Blanco <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9SU (2005) <br />Horsepower: 405 <br />Blade Type: Semi-Universal <br />Attachment: 1-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $58.82 NA <br />Operating Cost/Hour: $110.89 100 <br />Ripper op. Cost/Hour: $9.49 100 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $217.69 <br />Total Fleet Cost/Hour: $217.69 <br />MATERIAL QUANTITIES <br />Initial Volume: 100 <br />Swell factor: <br />Loose volume: <br />1.125 <br />113 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 157 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />75 feet <br />1.514.3 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />0% <br />5,650 feet <br />Abbreviation: None <br />Filename: C018-216 <br />CIRCES Cost Estimating Software