Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 215 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 (AVG.) <br />0.830 (1 SHIFT/DAY) <br />1.000 (DOZ-OC) <br />1.000 (CAT HB) <br />1.000 (CAT HB) <br />0.902 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.5053 <br />Adjusted unit production: <br />Adjusted fleet production: <br />1,066.44 LCY/hr <br />1066.44 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.204/LCY <br />Total job time: <br />Total job cost: <br />0.38 Hours <br />$82.67 <br />CIRCES Cost Estimating Software