Laserfiche WebLink
Mr. Barnard <br />Page 1 4 <br />April 18, 2011 <br />6.3.5 Exhibit E - Map <br />17. As required by Rule 6.2.1(2), revise the Mining Plan Map and the Reclamation Plan Map so <br />they conform to the following criteria: <br />a) Show the name of the Applicant <br />b) Be prepared and signed by a registered land surveyor, professional engineer, or other <br />qualified person. <br />c) Give the date prepared <br />d) Include a map title and a map scale <br />18. As required by Rule 6.3.5(2)(d), the Mining Plan Map must identify the direction that <br />construction material extraction v ill proceed. Please revise the Mining Plan Map <br />accordingly. <br />19. The Applicant has identified an area on Exhibit E-3 for the storage of large landscape rock <br />and retaining wall rock. Please clarify if this material is product to be sold or material to be <br />used during reclamation of the Barnard Quarry. <br />20. As required by Rule 6.3.5(3)(a), show the gradient of all reclaimed slopes <br />(horizontal:vertical) sufficient to describe the post mine topography on Exhibit E-4. <br />21. Please see comments under Exhibit D, No. 7 and revise the Reclamation Plan Map <br />accordingly. <br />22. As required by Rule 6.3.5(3)(d), state the average thickness of replaced overburden by <br />reclamation area or phase on the Reclamation Plan Map. <br />23. As required by Rule 6.3.5(3)(e), state the average thickness of the replaced topsoil by <br />reclamation area or phase on the Reclamation Plan Map. <br />6.3.6 Exhibit F - List of Other Permits and Licenses Required <br />24. Please confirm the Operator holds a Stormwater Discharge Permit from the Colorado <br />Department of Public Health and Environment. <br />6.3.7 Exhibit G - Source of Legal Right-to-Enter <br />No comment. <br />6.3.8 Exhibit H - Municipalities Within a Two-mile Radius <br />No comment.