Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 06A Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 (AVG.) <br />0.830 (1 SHIFT/DAY) <br />0.800 (FND-RF) <br />1.115 (CAT HB) <br />1.000 (CAT HB) <br />0.821 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.5015 <br />Adjusted unit production: <br />Adjusted fleet production: <br />702.10 LCY/hr <br />3194555 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 4550 Dozer(s) <br />Unit cost: $0.235/LCY <br />Total job time: 0.00 Hours <br />Total job cost: $1,172.68 <br />CIRCES Cost Estimating Software