My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-04_INSPECTION - M2000032
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2000032
>
2011-04-04_INSPECTION - M2000032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:21 PM
Creation date
4/13/2011 1:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000032
IBM Index Class Name
INSPECTION
Doc Date
4/4/2011
Doc Name
Inspection report
From
DRMS
To
MA Concrete Construction, Inc.
Inspection Date
3/24/2011
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page] of 2 <br />BULLDOZER WORK <br />Task description: Backfill settling pond <br />Site: Monument View Gravel Pit Permit Action: SI-01 Permit/Job#: M2000032 <br />PROJECT IDENTIFICATION <br />Task #: 06A State: Colorado <br />Date: 3/31/2011 County: Mesa <br />User: THM <br />Agency or organization name: DRMS <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D8R Series II - 8SU (2005) <br />310 <br />Semi-Universal <br />NA <br />1 per day <br />(CRG) <br /> Utilization % <br />Ownership Cost/Hour: $39.08 NA <br />Operating Cost/Hour: $87.10 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $164.67 <br />Total Fleet Cost/Hour: $749,240.25 <br />MATERIAL Q UANTITIES <br />Initial Volume: 5,000 <br />Swell factor: 1.000 <br />Loose volume: 5,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 1,400.0 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-5% <br />4,550 feet <br />2,800 lbs/LCY <br />Weight description: Clay - Natural bed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.100 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Abbreviation: None <br />Filename: M032-06a <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.