Laserfiche WebLink
5. Water Handling <br />All water rights issues such as availability of water for this operation, consumption rates, dust <br />control, etc. is presented in Exhibit G - Water Information. Sediment control designs are <br />included in Exhibit G. <br />6. Schedule of Operations <br />Mining operations will only occur as dictated by demand up to the maximum rates described <br />earlier in the mine plan. Mining, crushing, screening and washing may take place 12 months out <br />of the year and product will be sold throughout the year, although less material is expected to be <br />sold in winter months. It is possible that processed material will be stockpiled to allow mining <br />and processing to cease for parts of the year. The operator will not have night gravel mining <br />operations, although minor truck activity or repairs may occur after hours. <br />7. Haul Roads and Access <br />The access road will head northeast from the facilities area where it will intersect with Highway <br />141. This access road will not be reclaimed at the end of mining to allow access through the site. <br />The access road will be a graveled road approximately 24 feet wide. <br />Craig Ranch Pit, March 2011 D-6