My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (65)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (65)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
4/12/2011 12:35:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Ex. 70
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM0001754 <br />Page iii 0 <br />LIST OF APPENDICES <br />Appendix JilLe <br />A Regulatory Considerations <br />Division of Mineral and Geology Letter, dated June 26, 1996 <br />Division of Water Resources Telephone Call Record, dated October 26, 1996 <br />Elevation/Storage Relationship Calculation Brief <br />W. W. Wheeler Correspondence `Climax Seepwater Pond Hydrology', dated May 3, 1996 <br />B Borrow Area Data <br />Kumar's `Preliminary Geotechnical Engineering Study' Report, dated December 21, 1993 <br />1996 Test Pit Logs <br />Geotechnical Testing Results for Tenmile Tunnel Portal and Island Borrow Soil Samples <br />Geotechnical Testing Results for Mosquito Fault Soil Samples <br />Chemical Testing Results for Mosquito Fault Soil Samples <br />Borrow Soil Quantity Calculation Brief <br />C Seepage Control Analyses <br />1994 Borehole Logs with Packer Test results <br />1996 Borehole Logs <br />1996 Packer Test Logs <br />Permeability of Borrow Soils and Fractured Bedrock Calculation Brief <br />Flownet Analysis of Seepage Calculation Brief <br />D Slope Stability Analyses <br />E Dam Construction Materials <br />Foundation Excavation Quantity Calculation Brief <br />Zone Particle Size by Filtration Analysis Calculation Brief <br />Soil Quantity Required and Available by Particle Size Calculation Brief <br />Spillway Design Calculation Brief <br />Conveyance Pipe System Design Calculation Brief <br />Conveyance Pipe Headwall Design Calculation Brief <br />Walkway Support and Connection Design Calculation Brief <br />Summary of Construction Material Calculation Brief <br />• <br />c- ym pros rmur I \6104rep2. 12M319 <br />?_ r• rr• ? r_ r• <br />Cow .. = Environmental
The URL can be used to link to this page
Your browser does not support the video tag.