Laserfiche WebLink
04/15/97 TQE 18: 34 FAX W W WHEELER 009 <br />CM0001657 <br />Mr. Steven Ni Maly <br />December 9, 1996 Page 2 <br />• The owner should have the proper equipment and materials available to temporarily backfa the <br />breach, if the need arises. <br />• No diversion of water into the reservoir to initiate the reservoir filling process shah take place <br />until after the breach in the dam embankment has been properly backfillecl <br />• The owner or their representative should monitor the reservoir on a daily basis during the <br />spring snowmelt runoff to assure that the reservoir level is safely maintained below the <br />elevation of the breach. Appropriate actions should be undetakm if the reservoir level <br />approaches the elevation of the breach. <br />If you have nay questions concerning this matter, please fed ftee to contact Mark Haynes in our <br />Deaver office at (303) 866-3581 Eat 276. Please, also, keep Mr. Haynes informed of the construction <br />'progress and reservoir operation unril the-campledon ofibis project. <br />Sincerel , <br />Jack G. Byers, P.E. <br />Assistant State Engineer <br />xc: Orlyn Bell, Division Engineer <br />John Blair, Dam Safety Kidd Engineer <br />John Clapper, Climax Molybdenum Company, Owner Representative <br />J0Br#IAEfGr Ir3701Q3-ZDOC <br />0