My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (62)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (62)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
4/12/2011 12:34:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 68 & 69
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/15/97 TQE 16:34 FAa W W WHEELER Q002 <br />CM0001656 <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Departrnent of Natural Resources <br />1313 Sherman S rm Room 818 <br />Derwer. Colorado 80203 <br />Phone (303) 8603581 <br />FAX =1 SGG-3589 <br />December 9, 1996 <br />• <br />Nk. Steven M Maly <br />W.W. Wheeler and Associates. Inc. <br />3700 South Inca Street <br />Englewood, CO 80110 <br />r, <br />` When replying, please refer to: <br />CLIMAX MOLY NO.4 DAM <br />(AKA EAGLE PARK DAM) <br />Construction File Number. C-1106C <br />Water Division 5, DAMED: 370103 <br />SUBJECT: Winter Shut Down of the Construction Project <br />Dear Mr. Maly: <br />0 <br />4 r <br />Ipma S. l achimd <br />=D4= <br />We appreciate that you have kept this. office informed of the construction progress of the <br />seePwater pipeline installation project at the Climax Moly No. 4 Dam and for informing us of the <br />proposed winter shut down of the project. It is our understanding that a relatively awn cut has been <br />made through the dam embankment at the left abutment to facilitate the installation of the <br />aforementioned seepwater pipeline. Due to winter conditions at the site, the installation of the pipeline <br />and the backMing of the excavated trench can not be properly executed in accordance with the <br />approved plans and specifications. Therefore, the construction of this portion of the pipeline is planned <br />to be postponed until neat spring after the proposed backM materials for the trench bane thawed. <br />In your letter dated December 3, 1996, you requested that we allow the small breach section in <br />the dam embankment at left abutment to remain open until the spring of 1997,.at which time the pipeline <br />can be installed and the trench properly backfiilled. This condition is acceptable; however, this <br />acceptance is contingent on the following items: <br />• The Eagle Park Reservoir shall remain relatively empty during the winter months_ <br />The Robinson Dam and Reservoir should be operated such that no dischargc or spillage occurs <br />into the Eagle Park Reservoir during the snowmelt runoff neat spring or until the breach in the <br />Climax Moly No. 4 Dam has been backfilled. <br />C7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.