My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (62)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (62)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
4/12/2011 12:34:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 68 & 69
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t` <br />F <br />x3 <br />?f <br />r <br /> <br />C <br />P <br />C <br /> <br />• <br />r: <br /> <br /> <br />r <br />Uk <br />L <br /> <br /> <br />CM0001636 <br />Page 8 <br />a hydraulic barrier to isolate the Eagle Park Reservoir from being adversely impacted by the <br />seepage of poor quality water emanating from Robinson Lake and No. I Tailing Dam. The drain <br />will act as both a collection drain/pump-back system by collecting ground water downgradient <br />of Robinson Lake and pumping the ground water back into the lake. <br />The Robinson Lake drain will consist of perforated pipe(s) or similar drainage system connected <br />to a collection sump. The drainage system will be placed in an excavated trench and backfilled <br />with a pervious material, such as gravel. A 10 to 50 gallon-per-minute-rated submersible pump <br />placed within the collection sump will be used to pump the collected ground water from the drain <br />to Robinson Lake. A generalized schematic of the drain system is shown in the cross section on <br />Figure 5 and in the plan on Figure 3. General design specifications for the drain are presented <br />in Appendix A. <br />Optionally, a cutoff wall (such as a slurry wall or geosynthetic wall) could be added to the drain. <br />The purpose of the cutoff wall will be to enhance the performance of the drain by focusing the <br />collection of ground water upgradient of the drain. In addition, the cutoff wall will provide a <br />physical barrier to flow, thus adding a factor of safety to the protection of the Eagle Park <br />Reservoir. <br />Operation of the Robinson Lake drain will not violate Section 404 of the Clean Water Act. <br />Section 404 deals mainly with discharges to wetlands. The water collected by the drain will be <br />discharged back into Robinson Lake and not into the surrounding wetlands. In addition, operation <br />of the drain will not dewater the area, thus disturbing the wetlands. Therefore, wetland <br />disturbance, if any, would be minimal. <br />3.13 Robinson Lake <br />The goal of reclaiming Robinson Lake is to improve the water quality in the lake for ultimate <br />discharge to downstream users. Two reclamation measures were evaluated for Robinson Lake: <br />• Active reclamation, and <br />• Passive reclamation. <br />The following sections provide a summary of the applicable reclamation measures for Robinson <br />Lake. <br />Active Reclamation <br />Active reclamation of Robinson Lake will be similar to the approach used for the Eagle Park <br />Reservoir. Activities associated with active reclamation are illustrated on Figure 3 and include: <br />Elimination of poor quality surface water discharges to Robinson Lake from the
The URL can be used to link to this page
Your browser does not support the video tag.