Laserfiche WebLink
CMCDO1458 <br />Climax Mine - Robinson Lake Pump Station Replacement <br />Eagle County 1041 Application Submittal <br />The system design provides three vertical turbine-can pumps (two operating and one standby) to reclaim <br />water through a 21,300-foot long, 24-inch carbon steel and 30-inch HDPE pipeline to a two million gallon <br />mill process water storage tank. Approximately 8,000 feet of 24-inch standard weight carbon steel pipe <br />will be used in the first section (leaving the pump station towards the mill) of the reclaim pipeline in order <br />to withstand the 350 psig pressure. When operating pressure along the pipeline drops below 200 psig, <br />the 30-inch HDPE pipe will be installed for the remainder of the route to discharge into the mill storage <br />tank. Details of the SDR schedule for the HDPE pipe is presented below. The maximum design flow for <br />the Robinson Lake pump station is 10,000 gpm. <br />__ Description Value <br />Robinson Lake Pump Station: <br />_.... ._.._......_..__._._._ -...... __-- - -.---.__._ <br />__...__Pumping capacity 8,670 g..P._? --.--- <br />Pumping capacity (design) 10,000 gpm <br />Pump elevation <br />10,818 ft <br />Discharge elevation (Mill water tank) <br />?_-- 11,500 ft <br />_ Conveyance line length -? <br />- 21,260 ft <br />Conve ance line <br />Carbon Steel -_?-- __ 8,760 ft <br />- <br />HDPE SDR 9 <br />--._.._.__..-_.._._..------- - 4,920 ft <br />--- -----41- 0 ft ----- <br />HDPE SDR 11 5,300 ft <br />HDPE SDR 15.5 <br />......... _-...... _....._._...... _......... _.-. <br />2,280 ft <br />Pumps <br />-- <br />Number of Pump _s A2 o erating, 1 standby) 3 <br />Head (feet) 800 ft <br />`-_ Type Vertical Turbine Can <br /> <br />Flow Rate ...(eachL- --..._...... -- _...-- - --.._._...-.-_ - <br />...---=- -- 5,000_.gpm---- <br />Motor (HP) 1500 <br />The Robinson Lake Pump Station building is designed as an all steel pre-fabricated building. No potable <br />water or sanitary sewer systems are designed to be included in this building. Heating to the building will <br />be electric radiant heat. The instrumentation and controls for the pumping systems will include <br />emergency shut-off to the pumps and a fire alarm system reporting to the mill operators. <br />The general arrangement and dimensions of the building are shown on Drawing 540-S-ST-101 <br />(Attachment A). The dimensions of the building include a width of nearly 60 feet, length of 126 feet and <br />height of 40 feet. <br />A geotechnical investigation was performed to evaluate the depth to bedrock and assess the bedrock <br />qualities as they relate to foundation excavation and design. <br />r <br />4