My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (40)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:18 PM
Creation date
4/12/2011 12:32:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 39 to 43
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM0001331 <br />Findings of Fact, Conclusions of Law, Judgment and Decree <br />Case Nos. 92CW233 and 92CW336 - Page 57 <br />Accordingly, the Tenmile Creek water diverted by the Chalk Mountain Interceptor Ditch shall be <br />tributary to the East Fork of the Eagle River and be available for use therein. Seepage and <br />underdrain water entering Robinson Reservoir from the Robinson Tailing Pond shall be <br />accounted for in a similar manner. <br />b. Notwithstanding the preceding subparagraph 6.2.2.a., there will be <br />a net depletion to the Eagle River basin if either of the following conditions occur: i) the Chalk <br />Interceptor Mountain Ditch is not operated, or ii) water is delivered from the Chalk Mountain <br />Interceptor Ditch into Robinson or Chalk Mountain Reservoirs. However, so long as all water <br />entering Robinson and Chalk Mountain Reservoirs is retained in those facilities and subsequently <br />pumped to the Tenmile Creek basin, the occurrence of conditions i) or ii) shall not result in a net <br />depletion to the Tenmile Creek basin. <br />C. Taking into account the provisions of the preceding subparagraphs <br />6.2.2.a. and b., so long as the complex system of operations described in this paragraph 6.2 <br />continues, depletions to the Eagle River basin shall be calculated as follows: <br />If both the Tenmile Creek basin and Eagle River basin segments of <br />the Chalk Mountain Interceptor are being operated to bypass water <br />around Robinson Reservoir, then <br />D=0 <br />If only the Tenmile Creek basin segment of the Chalk Mountain <br />Interceptor is being operated to bypass water around Robinson <br />Reservoir, then <br />D = 0.014V <br />If only the Eagle River basin segment of the Chalk Mountain <br />Interceptor is being operated to bypass water around Robinson <br />Reservoir, then 0 <br />56642. WPD:S
The URL can be used to link to this page
Your browser does not support the video tag.