Laserfiche WebLink
Peabody Sage Creek Mine <br />SL-1 Phase 11 Bond Release Request <br />• • Attachment Descriptions <br />March 2011 <br />Attachment A - contains a Notarized Statement that all reclamation work has been <br />completed in compliance with approved permit and Rule 3.03.2(1)(e). <br />Attachment B, Public Notification Letters - contains a copy of each letter sent to the <br />general public and agencies. <br />Attachment C, Public Notice and Proof of Publication - contains a copy of the Public <br />Notice that was published in the Steamboat Pilot and verification that the notice was <br />published 4 consecutive times. <br />Attachment D, Topsoil Depth Sampling Summary - presents a summary of each sample <br />collected and the depth of topsoil at that sample location. The summary represents 933 <br />topsoil depth samples. <br />• Attachment E, Revegetation Supporting Documentation - presents documentation of the <br />vegetative monitoring program results <br />Attachment F, Water Quality Monitoring Summary - contains statistics representations <br />of the past five (5) year sampling results. <br />Attachment G, Bond Release Calculation - presents the rational and total sum for monies <br />requested. <br />• <br />14