Laserfiche WebLink
CMC0007O5 <br /> Protected ClImax <br />Bltl a Facility Desi ation Dimensions Material Volume I S ize Unit Costs Estimated/ <br /> Actual Cos <br />101 60 CONVEYOR conveyor elevated 3501 X 12W X 17H STEEL 350 L1N.FT. Demo Complete <br />101 61 CONVEYOR come m devated 420L X 1500 X 16H STEEL 420 UN.FT. Demo complete <br />101 63 CONVEYOR - mm or elevated 5001 X 15W X 15W STEEL 500 UN.FT. Demo Complete <br />101 67A CONVEYOR - mm E elevated 1050'1 X 12W X 17H STEEL 1050 UN.FT. Demo Complete <br />101 67B CONVEYOR -corn or elevated 1050'L X 12W X 17H STEEL 1050 UN.FT. Demo Complete <br /> MILL UTIUTY TRESTLE - elevated 450LX12VWX12H STEEL 450 UN.FT. Demo Complete <br /> CONVEYOR FOUNDATION - assume 40791 X 2W X 37 CONCRETE 24474 co R Demo Complete <br /> 0.5 I.A. fooling - for each I.A. conveyor <br /> Climax's Estim ated Conveyor R emoval Total Cos t $ <br /> <br />Notes. The Climax Method accepts the DMG's figures for demolifion on grade, arid for elevated conveyors uses a figure of 25% additional cost (verified by Steve Thomas of <br />Wayne Gomez Demolition and Excavaling, 11-11-97) for shearing the supports to get conveyor on the ground For instance, DMG's met estimate for an 18 x 18 conveyor on <br />grade is $60.75 per fool The Climax method am" this number and adds 25% due to the fad that the conveyor is elevated. The resultantcost per foot is 560.75 x 1.25 = <br />$75.94. Unit costs were inflated to 2010 dollars using the CPI ratio. The figure for condole demolition comes from experience at Horizon and Climax Storke Areas, where the <br />old explosive sheds (2 h ddck steel and re-bar) were demolished at a cost of $0.37 / cu It. It was inflated to 2010 dollars using the CPI ratio. <br /> <br /> Bore Yard Demolition <br /> <br /> OP PIT FIRE PLGS SHP- misc. non-haz cable 20'L X 20W X 511 COMBINATION 2000 CU.FT. $0.13 $ 260 <br /> OP PIT FIRE PLGS SHP- misc, non-haz debris 201LX 20W X 5'H COMBINATION 2000 CU.FT. $0013 $ 260 <br /> OP PIT FIRE PLGS WSFL misc. non-h- debris 201L X 20W X 5'H COMBINATION 2000 CU.FT. $0.13 $ 260 <br /> OP PIT FIRE PLGS WSH- misc. non-haz dens 20L X 20W X 5'H COMBINATION 2D00 CU.FT. $0.13 $ 200 <br /> OPEN PIT DOCKS on-hat debris <br />- misc. 2201 X low x sit COMBINATION 11000 CU.FT. $0.13 $ 1,430 <br /> IRECO PUNT FOUNDTN 1- misc, non-haz. debris 351 1 X 3500 X 51H COMBINATION 6125 CU.FT. 50.13 $ 796 <br /> IRECO PUNT FOUNDTN 2. misc. non-h- debris 26L X 2DW X 51H COMBINATION 2500 CU. FT. $0.13 S 325 <br /> IRECO PUNT FOUNDTN 3- misc, non-haz d"n 0W X 5'H COMBINATION 2500 CU.FT. 50.13 S 325 <br /> IRECO PUNT FOUNDTN 4- misc. non-haz. demo W X 5'H COMBINATION 5000 CU.FT. 30.13 S 650 <br /> CORE BLDG FOUNDATION. misc. non-hat deb is 80W X 5'H COMBINATION 48000 CU.FT. $0.13 S 6,240 <br /> NO 2 ELECTRIC EAST - misc. non-haz. debris 30W X 5'H COMBINATION 15000 CU.FT. 50.13 S 1 950 <br /> NO 2 ELECTRIC WEST - miscnon-haz. debris 3W X 5'H COMBINATION 11880 CU.FT. $0.3 $ 1.544 <br /> I/ R BLDG FOUND COVER. misc. no"=, dhns 150W X 5'H <br />4 COMBINATION 112500 CU.FT. $0.13 $ 14,625 <br />of 8.2608 BULK YARD - misc. non-haz, debris 800W X 5'H COMBINATION 8000000 CU.FT. See Next Una Item <br />Demo'd BULK YARD a.ka. "NORTH FORTY YAR COMBINATION 1133900 CU.FT. 30.13 Demo Com ete <br /> NO6 CR ORE PILE GRD. misc. non-hat debris 400W X 5'H COMBINATION 800000 CU. FT. $0.13 $ 104,000 <br /> MCNULTY GL PIPE MATL- misc. non-haz debris 5W X 5'H <br />S*H COMBINATION <br />COMBINA-nON 6250 CU.FT. $0.13 $ 813 <br /> KOKOMO PIPE SUPPLIES- misc. non-haz debris 5W X 5'H COMBINATION 6250 CU.FT. $0.13 $ 813 <br /> <br /> Substations and Utility Lines <br /> <br /> MAYFLOWER PUMP SUB - SUPERSTRUCTURE 110'L X 100W X 15-H STEEL 165000 CU.FT. $0.13 <br /> " - FLOOR 8T w/vere mesh 1101. X 100'00 CONCRETE 11000 SOFT. !net above <br /> <br /> MAYFLOWER SWITCHYARD- SUPERSTRUCTURE 8511 X 55W X 15'H STEEL 70125 CU.FT. $0.13 <br /> " -FLOOR 8Tw/wire mesh 851 X SSW CONCRETE 4675 SOFT. ind above <br /> <br /> P2S5 SUBSTATION - SUPERSTRUCTURE 201 X 26W X <br />15'H STEEL 7800 CU. FT. $0.13 Demo Complete <br /> - FLOOR 8T whvira mesh _ <br />201 X 26W CONCRETE 520 SOFT. ind above <br /> <br /> 3 MILL SUBSTATION -SUPERSTRUCTURE 1551 X 30W X 15'H STEEL 69750 CU.FT. 60.13 $ 9.058 <br /> " " - FLOOR 8T vdwre mesh 1551 X 30W CONCRETE 4650 SOFT. ind above <br /> <br /> 37 CONV SUBSTATION - SUPERSTRUCTURE 35-L X 29W X 151H STEEL 15225 CU.FT. 50.13 Demo Complete <br /> " " " - FLOOR 8'T wlwire mesh 36L X 29W CONCRETE 1015 SO.FT. Ind some <br /> <br /> NO 2 MILL SUB YARD - SUPERSTRUCTURE 561 X 40W X 151H STEEL 33600 CU.FT. 50.13 Demo Complete <br /> " - FLOOR BT wMire mesh SUL X 40W CONCRETE 2240 SO.FT. ind some <br /> <br /> 2 CRUSHER DUCON SUB- SUPERSTRUCTURE 15-L X 1200 X 15-H STEEL 2700 CU.FT. $0.13 Demo Complete <br /> "- FLOOR 8T wMire mesh 1SL X 12W CONCRETE 180 SO.FT. ind above <br /> <br /> OPEN PIT SHOP SUB - SUPERSTRUCTURE 25L X 25W X 15'H STEEL 9375 CU.FT. $0.13 $ 1,219 <br /> " " -FLOOR BT wAmre mesh 251X 25W CONCRETE 625 SOFT. ind some <br /> <br /> ROBINSON PUMP SUB - SUPERSTRUCTURE 251. X 25W X 16H STEEL 9375 CU.FT. $0.13 $ 1,219 <br /> " " " - FLOOR BT wMlre mesh 251 X 25W CONCRETE 625 SO.FT. ind above <br /> <br /> 4 DAM SUBSTATION -SUPERSTRUCTURE 26L X 2500X 1TH STEEL 9375 CU.FT. $0.13 Demo Complete <br /> " " - FLOOR TT wAA,e mesh 251 X 2500 CONCRETE 625 SOFT. ind some <br /> <br />REx1 -MED CHALK MOUNTAIN / ROBINSON LAKE SUB 20L X SW X 811 WOOD 1280 CU.FT. 50.13 S 166 <br />vienooe POLE MOUNTED PLATFORM ON GROUND WOOD POLES ind above <br /> <br />REMEASURED CAVR SUBSTATION-SUPERSTRUCTURE (WOOD) 28'L X 20W X 15H WOOD 8400 CU.FT. $0.13 S 1.092 <br />-M - FLOOR T THK wMire mesh 101 X 20WX17HK CONCRETE 200 SOFT. ind above <br /> <br />Aobm bxeda OLD HOSPITAL SUB-SUPERSTRUCTURE (WOOD) 6011 X 30W X 811 WOOD 14400 CU FT 50.13 S 1,872 <br /> CONCRETE SLAB 4411 X 5'X 1' THICK CONCRETE ind above <br /> <br />ADDED Sse-oe DOMESTIC WATER SUB- WOOD STRUCTURE 201 X 20W X 8'H WOOD 3200 CU FT $0.13 S 416 <br /> CONCRETE SLAB 8%X 4W X 1' THK CONCRETE ind above <br /> <br />ADDED esem IRECO PLANT SUB- SUPERSTRUCTURE 201 1 X 20W X 8'H WOOD 3200 CU FT 50.13 S 416 <br /> CONCRETE SLAB 17 X 17 X 0.5' THK CONCRETE ind above <br /> <br />ADDED Scam OPEN PIT SWITCHGEAR UNIT 16L X 8W X 17H WOOD 1536 CU FT $0.13 <br /> CONCRETE SLAB 01 X 4W X 1' THK CONCRETE ind above <br /> <br />AWED Uan TAIUNG DEUVERY HOUSE SUBSTATION 8'L X OW X 8'H WOOD 512 CU FT $0.13 $ 67 <br /> CONCRETE CONTAINMENT CELL 81. X 8W X 16-H CONCRETE ind above <br /> <br />ADDED easae MCNULTY SWITCHYARD 37LX25WX25'H STEEL 20000 CU FT $0.13 <br /> CONCRETE PIERS AT BASE 4 EACH VARIES CONCRETE 128 CU FT ind above <br /> <br />ADDED Szsas MCNULTY SUBSTATION 30-L X 30'W X 25'H WOOD 22500 CU FT 50.13 <br /> CONCRETE PIERS AT BASE (2 EACH VARIES CONCRETE 84 CU FT ind above <br /> <br /> WARRENS PUMP STATION SUBSTATION 20'L X 1 SW X 8'H STEEL 2560 CU FT $0.13 <br /> CONCRETE CONTAINMENT CELL 1OLX10W X 1' THK CONCRETE 160 SO FT ind above <br /> <br /> STORKE UTILITY UNES-23 POLES23TAVG <br />SPACING <br />5451 UN. FT. <br />WOODWIRE <br />5451 <br />UN.FT. <br />S 0.78 <br />F OPEN PIT UTIL UNES-21 POLES23TAVG SPACING 4977 UN. FT. WOODMeRE 4977 UN.FT. S 0.78 $ 3,877 <br /> MINE/MILL UT1L UNE6246 POtES23TAVG <br />SPACING <br />58,302 UN.FT. <br />WOORE <br />58302 <br />UN.FT. <br />$ 0.78 <br />lBelm TAILING UTILITY UNE-25 POLE. SPACING 5925 UN. FT. WOODMARE 5925 UN.FT. S 0.78 $ 4,616 <br /> TOTAL THIS S PREADSH EET Demo 2 S 644.113 <br />is <br />• <br />•