CMC00O704 <br /> <br />?J <br />• <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />Demolition 2 - linear facilities <br />Total Cost <br />$844,113 <br /> Protected Climax <br />BI a Facility Desi ation Dimensions Material Vol ume Si Unit Costs Estimated/ <br /> Actual Cost <br /> Water Control Structures Demolition <br /> <br />75 MCNULTY PUMP STATION- SUPERSTRUCTURE 44'L X 34W X 14'H STEEL 20944 CU.FT. $0.25 Demo Complete <br /> ' - FLOOR BT w/rebar 441 X 34W CONCRETE 1496 SOFT. ind some <br /> -FOOTING 1.57X2. 44'+44+34'+34' CONCRETE 156 UN.FT. ind above <br /> <br />76 4 DAM SEEP BUILDING- SUPERSTRUCTURE 20'L X 22W X 10'H STEEL 4400 CU.FT. $0.25 <br /> ' - FLOOR BT wMire mesh 20L X 22W CONCRETE 440 SOFT. ind above <br /> ' -FOOTING 1.57 X 2.0W 20'+20'+27+27 CONCRETE 84 UN. FT. ind above <br /> <br />77 ROBINSON PUMP STATION" SUPERSTRUCTURE 50L X 68W X 15'H BLOCK 51000 CU.FT. 50.25 <br /> ' -FLOOR 12Tw/rebar 501 X 68W CONCRETE 3400 S0FT. ind above <br /> " • FOOTING 2.07 X 3. 50+50'+68'+68' CONCRETE 236 UN.FT. ind above <br /> <br />78 MAYFLOWER PUMP STATN- SUPERSTRUCTURE 981 X 52W X 77H STEEL 366912 CU.FT. 50.25 <br /> " "-FLOOR 1TTw/rebar 98'LX 52W CONCRETE 5096 SO.FT. ind above <br /> " - " - FOOTING 2.07 X 3.0 98'+98'+57+57 CONCRETE 300 UN.FT. Ind above <br /> <br />79 MAYFLOWER HUNG TANK- SUPERSTRUCTURE 28'1 X 28W X 18'M STEEL 14112 CU.FT. $0.25 E 3,528 <br /> " "- FLOOR BT plain) 28'1 X 28'W CONCRETE 784 SOFT. ind above <br /> " "- FOOTING 1.57 X 2. 28'+28+28'+28' CONCRETE 112 UN.FT, ind above <br /> <br />80 PROPERTY UNE FLUMES- SUPERSTRUCTURE 40L X 15W X 8'H WOOD 4800 CU.FT. $0.25 <br /> ' • FLOOR BT gin 40L X 15W CONCRETE 600 SOFT. ind above <br /> " • FOOTING 1.57 X 2. 40+40+16+15' CONCRETE 110 UN.FT ind above <br /> <br />81 CHALK MTN PUMP HOUSE- SUPERSTRUCTURE 25L X25W X 20H STEEL 12500 CU.FT. $0025 $ 3,125 <br /> " "-FLOOR BT w/rebar 25L X 25W CONCRETE 625 SQ.FT. ind above <br /> -FOOTING 1.57 X 2.OW 25'+25'+251+25' CONCRETE 100 UN.FT. ind above <br /> <br /> As It Climax ACAD M easured <br /> Asphalt Road and Lot Demolition Disposition AAM,' <br /> <br /> OLDHIGHWAY -demolish as slt n and haul ASPHALT 84,462 s ds, $142 $ 288,605 <br /> THORPE AVENUE - demolish as "t n and haul ASPHALT 7,074 s ds $3.42 S 24,172 <br /> I/R BACK PARKING LOT- demolish as aft burial in-place ASPHALT Demo Complete Demo C to <br /> GEOL BLDG BACK PK LT- demolish as alt n and haul ASPHALT Demo COmplING Demo c to <br /> SCHOTT BOULEVARD - demolish asphalt ounel in-place ASPHALT Demo ComplMe Demo C to <br /> CONNECTNGROADI -demolishas alt n andhaul ASPHALT 2,752 sqyds. $3.42 5 9,404 <br /> SECOND STREET - demolish asphalt burial in-oace ASPHALT Oemo Carpels Demo C re <br /> CONTRACTORS ENTRANCE- demolish as haft d and haul ASPHALT ind TOH Park S <br />Marty of these GATE PARKING - demolish asphalt lip and haul ASPHALT 5,168 yds. $142 $ 17,659 <br />rlon arms CONNECTING ROAD 2 • demolish asphalt rip and haul ASPHALT 11874 yds. 53042 $ 6,403 <br />and roadways FIFTH STREET - demolish as alt burial in-place ASPHALT Demo Complex Demo Compete <br />are being TDH PARKING - demolish asphalt n and haul ASPHALT 7,063 s yds. $3.42 $ 24,134 <br />changed CO. BLVD - demolish asphalt burial in -place ASPHALT Demo Complete Demo ConVIeft, <br />construction TRANSPORTATION LOT - demolish asphalt n and haul ASPHALT 3,573 ds $3942 $ 12,209 <br />adivi as ACCESS TO 2 CRUSHER - demolish asphalt n and haul ASPHALT 4,155 ds $3.42 S 14,198 <br />of 8-26-08 NO 2 CRUSHER LOT - demolish as haft rip and haul ASPHALT ind some $ <br /> CONNECTING ROAD 3 • damdish as alt n and haul ASPHALT 023 m Yds. $3.42 S 6,913. <br />Fdlowin the HOTEL BOULEVARD -dendish as ah n and haul ASPHALT Deno C a D_C to <br />determination NO 6 CRUSHER ROAD - demolish as It n and haul ASPHALT 11,807 da, $3.42 5 40,344 <br />of a final NO 6 CRUSHER PARKING- demolish asphalt rip and haul ASPHALT ind above $ <br />lbdld-out of the SURF MAINT RD - demolish as aft rip and had ASPHALT 2.794 a $3042 $ 9,547 <br />Climax 2010 SURF MAIN! LOT - demolish asphalt rip and haul ASPHALT ind above $ <br />Project all of INFIRMARY LOT • demolish as alt n and haul ASPHALT Deno C b Demo Combat- <br />these areas OXIDE MILL LOT -demolish asphalt redaimed'91 ASPHALT DemcComplete Demo C le <br />can be GO LOT - demolish as alt rip and haul ASPHALT Demo C b Demo compirts <br />reeva luated PHASE ONE SHOP LOT - demolish asphalt n and haul ASPHALT Demo C ,"b, Ouno Conpele <br /> MAYFLOWER W WTP PK LT• demolish as alt burial in- acs ASPHALT Demo Consirle Oenw conors <br /> OLD HIGHWAY -tlemdish asphalt n and haul ASPHALT mdm m. E <br /> <br /> Mill Parkin No.i n and haul ASPHALT 2,768 s ds $3042 $ 9,458 <br /> MII Parkin No. 2 n and haul ASPHALT • 1,686 a ds $142 $ 5,761 <br /> Domestic Water Pkg. rip and haul ASPHALT 1,341 s ds $3.42 $ 4,582 <br /> Maly We Pk 9. n and haul ASPHALT Deno C re da, Demo Complete <br /> Precon Parldrrg i and haul ASPHALT Demo Compare a ds Demo Complete <br /> First Stree banal in- ace ASPHALT Demo e s ds, Demo Complete <br /> <br /> C4imaxs To tal Asphalt Surface Arm to Pip a Had = 138,540 s ds, <br /> 138,540 check <br /> Climax s Estimated Asphalt Removal (Rip & Haul Total Cost $3.41698 Is x 1W,540 5 473,388 <br /> <br /> C'bbi Rem I <br /> Coal/ <br /> MAYFLOWER -remove aibbin 440L X 8W X4'D TIMBER 1760 s.R $1.025 E 1.804 <br /> NO 3 MILL remove cribbing 300'L X 10W X 170 TIMBER 3600 . ft. 51.025 $ 3,690 <br /> 45 DRIVE remove cribbing 1601 X SW X e'D TIMBER 1280 s q, ft. $1.025 Demo Comate <br /> OPEN PIT SHOP a cribbing 2501 X 12W X 209 TIMBER 5000 s q. ft. 51.025 <br /> <br />101 C rive or Demolition <br /> <br />101 23 CONVEYOR - cony or on grade 10511 X 12W X t7H STEEL 105 UN.FT. Demo Complete <br />101 24 CONVEYOR co-try., elevated 78-L X 18W X 18'H STEEL 78 UN.FT. Demo Complete <br />101 25 CONVEYOR - cam or elevated 105'1 X 12W X 17H STEEL 105 UN.FT. Demo Complete <br />101 a readrkn walk 1680 SO.FT. 177 CONCRETE 1680 SOFT. Demo Complete <br />101 28 CONVEYOR - cam or an grade 340L X 17W X 17H STEEL 340 UN.FT. Demo Complete <br />101 29 CONVEYOR - conveyor elevated 4201 X 12W X 12'H STEEL 420 UN.FT. Demo Complete <br />101 30B CONVEYOR - conveyor elevated 245'L X 12W X 17H STEEL 245 UN.FT. Demo Complete <br />101 - per retaining walls 300 SQ.FT. 177 CONCRETE 300 SOFT. Demo Complete <br />101 32 CONVEYOR - =mayor elevated WL X 12W X 17H STEEL 80 UN.FT. Demo Complete <br />101 38 CONVEYOR - conveyor on grade 4WL X 12W X 17H STEEL 460 UN.FT. Demo Complete <br />101 45 CONVEYOR - com or elevated 1251 X 12W X 17H STEEL 125 UN.FT. Demo Com ea <br />101 - - asbestos removal NA ASBESTOS 1 ESTIMAT E L.S. Demo Complete <br />101 48 CONVEYOR - conveyor an grade 2001 X 12W X 17H STEEL 200 UN.FT. Demo Complete <br />101 - asbestos removal NA ASBESTOS 1 ESTIMAT E L.S. Demo Complete <br />101 49 CONVEYOR - conveyor on grade 150'LX 12W X 17H STEEL 150 11N.FT. Demo Com de <br />101 53 CONVEYOR - mm r on ade 1701 X 12W X 17H STEEL 170 UN.FT. Demo Complete <br />101 55 CONVEYOR cowevor elevated 1601 X 12W X 17H STEEL 160 UN.FT. Demo Complete <br />101 56 CONVEYOR - conveyor on grade 1201 X 12W X 17H STEEL 120 UN.FT. Demo Can ete <br />101 - asbestos removal NA ASBESTOS 1 ESTIMAT E L.S. Demo Compete <br />101 57 CONVEYOR conveyor on grade X 12W X 12'H STEEL 40 UN.FT. Demo Compete <br />101 58 CONVEYOR - mm or <br />elevated <br />E X 12W X 1 <br />1 <br />M <br />STEEL <br />630 <br />L1N.FT. <br />Demo Com re <br />101 59 CONVEYOR - conveyor elevated .1 <br />X 17W X I <br />, STEEL 370 UN.FT. Demo Com ee <br />Fea 2011 <br />1.-