Laserfiche WebLink
P- NnaMmerl (Au-06) -- - <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />E*F Waste Rock Dumps <br />Assumptions: <br />(1) Truck Fleet. Loader, and Dozers in 2000 Reclamation Cast Estimate are reasonable <br />(2) Sod Replacement Thickness is 4 inches; Swell Factor a 1,215 from 2000 Cost Estimate (See Map for Locations of Soil Replacement") <br />(3) Liming at 20 Tons/Acre will be required to neutralize acidity in the waste rock <br />(4) Ripping will be required to incorporate the time before topsoil replacement <br />(5) Revegetation will follow soil replacement and is covered elsewhere <br />Tasks: <br />(1) Grade east side of E-Dump; <br />(2) Spread and Incorporate Ag Lime; <br />(3) Replace Topsoil on E-Dump and F-Dump <br />Timing <br />2011+ <br />Total Cost <br />$205,326 <br />Calculations <br />CM0000674 <br /> <br />T-k'An• I nal - `swsH __._ <br />Of/ 'Ui?it?. <br />Rol Egri ip <br />ProduI-, _' Unris Co.oU ? <br />!{rr R,q'd E T <br />Tolsl Equlp Cost ?,"ti ern C?.n. i 7or.l ht,ler,u? <br />T, r.1 Lebor,C / - <br />Toiul C-l <br /> `JClume Fer for P Labor 1. larlalc Coal <br />Grading east side of E-Dump' <br />CAT D9 1 169,200 cy 578.48 cy/Tr 292.5 $ 228.01 $66,690.03 $33.81 $9,887.71 $76,577.74 <br />Load, Haul 8 Spread Topsoil' <br />CAT 773B Haul Truck 3 49,465 1.1215 55,475 cy 171.00 cy/hr 324.4 $ 215.83 $70,019.04 $30.02 $9,738.78 $79,757.82 <br />988 Loader 1 Trucks Per Loader 3 108.1 $ 231.12 $24,993.61 $30.40 $3,287.93 $28,281.53 <br />CAT D7 1 55,475 cy 460.88 ay/hr 120.4 $ 138.24 $r0 Al- 14 $33.81 S4 Ong 0a S7O 769 47 <br /> Hsi ?7, y i T, iel E, , , - T •.I C,1- I - T.I ?I h'ntei I ?.rl 1, rl <br />-TOTAL COSTS - - 845 $178,342 - $26,983 ` $0 $205,326 . <br />I& L 0 0