Laserfiche WebLink
Permit Amendment (AM-06( • COmax Mine <br />CM0000673 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />Mine & Mill Complex <br />Assumptions <br />Building and concrete removal is addressed under demolition <br />Final grading required to obtain stable contours and drainage <br />Tasks <br />Regrade Mine/Mill Complex area, assume T cu(/fill OR 3' soil cover over foundations across 228.9 ac area. From previous state b ased estimate <br />Finish grade Mine/MIIIComplex area. From previous state b ased estimate <br />Haul and spread topsoil in Mine/Mill Complex area, assume 4" topsoil or bioselids. From previous state b ased estimate <br />Timing <br />End of Mine Life <br />Total Cost <br />$1,617,629 <br />Calculations <br /> <br />' <br />I <br />-- <br />' :.? <br />T t <br />X Y`-' <br />IlI]I <br />T]sk/Area A of Equip Swoll Factor <br />Volum• <br />_ Qty Unllf <br />Prodnctlon , <br />- Units Hrs Req'd -CosbUnll <br /> <br />Equi <br />Total Fqu,l, Cost L:IU II <br /> <br />Cbar . Tol]l L b i;a lU 1 <br /> <br />Cost M1ter]Is . <br />el I k Tit C fF .j <br />M <br />.? . <br /> p COI j <br />Regrade Mine/Mill Complex area, assume 3' cut/011 OR 3' soil cover over foundations across 228.9 ac area. <br />CAT D9N Dozer 1 1,107,876 1.00 1,107,876 (cy) 231.00 (cy/hr) 4,796.00 $228.01 $1,093,523.43 $33.81 $162,130 $1,255,653 <br />Finish grade Mine/Mill Complex area. M Grader Passes Hours with a fleet of 5 dozers 959.20 <br />CAT 14G Grader 1 228.9 acres 1.27 aclhr 180.24 $118.09 $21,285 $32.37 $5,835 $27,120 <br />Haul and spread topsoil in Mine/Mill Complex area, assume 4" topsoil or blosolids. <br />CAT 7736 Haul Truck 3 123,097 1.215 149,563 (cy) 211.63 (cy/hr) 706.72 $215.83 $152,532 $30.02 $21,215 $173,747 <br />CAT 9888 Loader 1 Trucks Per Loader 3 236 $231.12 $54,447 $30.40 $7,163 $61,609 <br />D7G 1 236 $138.24 $32,565 $33.81 $7,964 $40,529 <br />CAT 14G Grader 1 236 $118.09 $27,619 $32.37 $7,626 $35,445 <br />Water Truck 1 236 $69.43 $16,355 $30.02 $7,072 $23,426 <br /> His Reg J . Total Equip;Cost l'otal l..boic-t : Tot I Coar;-; <br />TOTAL COSTS . '-7,584 $1,398,525 .. 5219 219,004 .?' $1,617,529 <br />&hlbit L Feb 2011