My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-31_PERMIT FILE - M2011017
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011017
>
2011-03-31_PERMIT FILE - M2011017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:11 PM
Creation date
4/4/2011 1:30:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011017
IBM Index Class Name
PERMIT FILE
Doc Date
3/31/2011
Doc Name
Application adequacy issue and FW estimate
From
DRMS
To
Breeze Basin Resources, Inc.
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task # 002 Page 2 of 2 <br />Load Bucket Capacit <br />Total Travel Time: 0.1804 minutes <br />Total Cycle Time: 0.6704 minutes <br />Rated Capacity: 4.20 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - uniform aggregates to 1/8" (95-100%) 0.975 <br />Adjusted Capacity: 4.10 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6380 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 366.49 LCY/Hour <br />Adjusted Hourly Unit Production: 304.19 LCY/Hour <br />Adjusted Hourly Fleet Production: 304.19 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 194.09 <br /> <br />299 /LCY <br />Unit cost: $0 Total job cost: $17,668.00 <br />. <br />Hours <br />CIRCES Cost Estimating Software