My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-31_PERMIT FILE - M2011017
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011017
>
2011-03-31_PERMIT FILE - M2011017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:11 PM
Creation date
4/4/2011 1:30:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011017
IBM Index Class Name
PERMIT FILE
Doc Date
3/31/2011
Doc Name
Application adequacy issue and FW estimate
From
DRMS
To
Breeze Basin Resources, Inc.
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 2 <br />WHEEL LOADER - LOAD AND CARRY WORK <br />Task description: Transport backfill from stockpile to highwall <br />Site: Frentress Gravel Pit Permit Action: Initial Bond Permit/Job#: M2011017 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: <br />Date: 3/31/2011 County: <br />User: DMC <br />Colorado <br />Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 950G (2002) <br />Attachment 1: ROPS Cab <br />Abbreviation: None <br />Filename: MO 17-002 <br />Horsepower: 180 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $19.34 NA <br />Operating Cost/Hour: $33.20 100 <br />Operator Cost/Hour: $38.49 NA <br />Total Unit Cost/Hour: $91.03 <br />Total Fleet Cost/Hour: $91.03 <br />MATERIAL QUANTITIES <br />Initial volume: 48,000 CCY Swell factor: 1.230 <br />Loose volume: 59,040 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: Unadjusted Basic Cycle Time (load, dump, maneuver): 0.550 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material: Material up to 1/8" diameter 0.02 0.020 (Cat HB) <br />Stockpile: Conveyor or dozer piled 10 ft. high and up 0.00 0.000 (Cat HB) <br />Truck Ownership: Common ownership of trucks and loaders -0.04 -0.040 (Cat HB) <br />Operation: Constant operation -0.04 -0.040 (Cat HB) <br />Dump Target: Nominal target 0.00 0.000 (Cat HB) <br />Net cycle 1 tme Halusimem. <br />Adjusted Basic Cycle Time: <br />-0.060 <br />0.490 <br />minutes <br />Rolling Resistance - Road Conditions <br />Haul: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Return: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul and Return Time <br /> Length Grade Res. Rolling Total Res. Travel Time Source <br /> (feet) (%) Res. (%) (%) (minutes) <br />J <br />Haul Route: 100 0.00 5.00 5.00 0.0956 ]Cat HB) <br />Return Route: 100 0.00 5.00 5.00 0.0848 Cat HB) <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.