Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 007 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />STEAMBOAT SPRINGS <br />28.00 miles <br />35.00 mph <br />$3,386.26 <br />$33.46 <br />Non-Roadable <br />Equipment Roadable <br />Equipment <br />0.80 0.80 <br />0.80 0.80 <br />0.50 NA <br />0.50 NA <br />2.60 1.60 <br />Total job time: 5.20 Hours <br />Total job cost: $3,419.72 <br />CIRCES Cost Estimating Software