Laserfiche WebLink
Page 1 of 2 <br />Task description: <br />Site: Frentress Gravel Pit <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Mob./Demob. reclamation crew/equipment <br />Permit Action: Initial Bond Permit/Job#: M2011017 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: <br />Date: 3/31/2011 County: <br />User: DMC <br />Agency or organization name <br />Colorado <br />Routt <br />DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership Cost/Hour: $16.63 $18.37 $22.33 <br />Operating Cost/Hour: $44.38 $46.13 $50.07 <br />Operator Cost/Hour: $27.66 $27.66 $27.66 <br />Helper Cost/Hour: $0.00 $25.39 $25.39 <br />Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br />Description Unit Cost/hr/ unit Cost/hr/unit Size Cost/hr/ Cost/hr/ fleet Cost/ fleet <br /> (TONS) fleet <br />CAT 950G 2002) 19.53 $19.34 $88.67 1 $108.01 $88.67 $250.00 <br />Cat D8R Series II - 47.80 $39.08 $117.55 1 $156.63 $117.55 $250.00 <br />8U (2005) <br />Drill/Broadcast 25.00 $39.59 $88.67 1 $128.26 $88.67 $250.00 <br />Seeder with Tractor <br />Subtotals: $392.90 $294.89 $750.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size Haul Trip <br />Cost/hr/ fleet Return Trip <br />Cost/hr/ fleet <br />Light Duty Pickup, 4x4, 1 T. Crew $20.91 1 $20.91 $20.91 <br />Subtotals: $20.91 $20.91 <br />Abbreviation: None <br />Filename: M017-007 <br />CIRCES Cost Estimating Software