Laserfiche WebLink
March 22, 2011 C-1 981-025/North Thompson Creek Mine JRS <br /> the embankment and into the refuse pile pond(also Phase III Released) from the rerouted off outfall. The water <br /> from the treatment ponds has been rerouted into these ponds and there has not been any discharge into the North <br /> Thompson Creek for at least a year. There is no iron staining at either the discharge to P-9 or the refuse pile pond. <br /> ROADS—Rule 4.03 Construction 4.03.1(3)/4.03.2(3)Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br /> Maintenance4.03.1(5)and(6)/4.03.2(5)and(6)Reclamation 4.03.1(7)/4.03.2(7): <br /> -the remaining road was wet,muddy and covered with snow. This road has been approved as permanent and <br /> Phase III Released. <br /> RECLAMATION SUCCESS—Rule 4.15,Rule 3: <br /> -Overall,the reclamation at the North Thompson Creek Mine is good. As stated above, approximately 4 acres <br /> remain in the disturbance boundary as a developed water resource. There is no more reclamation required at the <br /> site. <br /> DOCUMENTS RECEIVED:None <br /> This concludes the 22 March 2011 inspection report for the North Thompson Creek Mine. <br /> Number of Partial Inspection this Fiscal Year: 0 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 7 <br />