Laserfiche WebLink
Task: 125 State: Colorado <br />Date: 2 December 2010 County: Delta <br />User: JRS Site: Bowie No. 1 Mine <br /> <br />Permit Action: 2010 Midterm Review (M T-6) <br /> <br />Task Description: Plug and Seal All Boreholes <br /> <br />Subtask Quantity Cost Total <br /> <br />GVB-10A and GVB-10B <br />Bottom Plug 2 $ 184.03 $ 368.06 <br />Fill Holes with Concrete 330 $ 10.65 $ 3,514.50 <br />Borehole Marker 2 $ 3.72 $ 7.44 <br />Cut Casing at Surface 2 $ 5.71 $ 11.42 <br />Drill Rig Time 16 $ 183.98 $ 2,943.68 <br />Water Truck Time 16 $ 96.58 $ 1,545.28 <br /> <br />TR-49 and MR-124 Exploration Holes <br />Bottom Plug 3 $ 155.83 $ 467.49 <br />Fill Holes with Concrete 1065 $ 10.65 $ 11,342.25 <br />Borehole Marker 3 $ 3.72 $ 11.16 <br />Cut Casing at Surface 3 $ 5.71 $ 17.13 <br />Drill Rig Time 48 $ 183.98 $ 8,831.04 <br />Water Truck Time 48 $ 96.58 $ 4,635.84 <br /> <br />TR-50 Exploration Holes BV-1 and BV-2 <br />Bottom Plug 2 $ 131.15 $ 262.30 <br />Fill Holes with Concrete 137 $ 10.65 $ 1,459.05 <br />Borehole Marker 2 $ 3.72 $ 7.44 <br />Cut Casing at Surface 2 $ 5.71 $ 11.42 <br />Drill Rig Time 8 $ 183.98 $ 1,471.84 <br />Water Truck Time 8 $ 96.58 $ 772.64 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />TASK TOTAL $ 75,765.61 <br />Page 2 of 2