My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-24_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2011-01-24_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:19 PM
Creation date
4/1/2011 9:05:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
1/24/2011
Doc Name
Cost Summary
Section_Exhibit Name
Reclamation Cost Estimate MR126
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task: 125 State: Colorado <br />Date: 2 December 2010 County: Delta <br />User: JRS Site: Bowie No . 1 Mi ne <br /> <br />Permit Action: 2010 Midterm Review (MT -6) <br /> <br />Task Description: Plug and Seal All Boreholes <br /> <br />Subtask Quantity Cost Total <br /> <br />Seal All 2.5" Wells (9) <br />Bottom Plug 9 $ 61.37 $ 552.33 <br />Fill Holes with Concrete 3 $ 10.65 $ 31.95 <br />Borehole Marker 9 $ 3.72 $ 33.48 <br />Cut Casing at Surface 9 $ 5.71 $ 51.39 <br />Drill Rig Time 9 $ 183.98 $ 1,655.82 <br />Water Truck Time 9 $ 96.58 $ 869.22 <br /> <br />Seal All 5" Wells (13) <br />Bottom Plug 13 $ 131.15 $ 1,704.95 <br />Fill Holes with Concrete 219 $ 10.65 $ 2,332.35 <br />Borehole Marker 13 $ 3.72 $ 48.36 <br />Cut Casing at Surface 13 $ 5.71 $ 74.23 <br />Drill Rig Time 52 $ 183.98 $ 9,566.96 <br />Water Truck Time 52 $ 96.58 $ 5,022.16 <br /> <br />Seal All Shallow 6" Wells (3) <br />Bottom Plug 3 $ 131.15 $ 393.45 <br />Fill Holes with Concrete 20 $ 10.65 $ 213.00 <br />Borehole Marker 3 $ 3.72 $ 11.16 <br />Cut Casing at Surface 3 $ 5.71 $ 17.13 <br />Drill Rig Time 12 $ 183.98 $ 2,207.76 <br />Water Truck Time 12 $ 96.58 $ 1,158.96 <br /> <br />Seal One Inter. 6" Well <br />Bottom Plug 1 $ 131.15 $ 131.15 <br />Fill Holes with Concrete 50.4 $ 10.65 $ 536.76 <br />Borehole Marker 1 $ 3.72 $ 3.72 <br />Cut Casing at Surface 1 $ 5.71 $ 5.71 <br />Drill Rig Time 8 $ 183.98 $ 1,471.84 <br />Water Truck Time 8 $ 96.58 $ 772.64 <br /> <br />Seal All Deep 6" Wells (2) <br />Bottom Plug 2 $ 131.15 $ 262.30 <br />Fill Holes with Concrete 207 $ 10.65 $ 2,204.55 <br />Borehole Marker 2 $ 3.72 $ 7.44 <br />Cut Casing at Surface 2 $ 5.71 $ 11.42 <br />Drill Rig Time 24 $ 183.98 $ 4,415.52 <br />Water Truck Time 24 $ 96.58 $ 2,317.92 <br /> <br /> <br /> <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.