Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 014 State : Colorado Permit/job #: C-1981-038 <br />Date : 1210212010 County :Delta Abbreviation :none <br />User : JRS Site: Bowie No. 1 Mine Filename :C038-014 <br />Permit or other job action :2010 Midterm Review (Mt-6) <br />Task description :Haul Fill from Stota_ce Zone 1-B to Coal Zone 4-B <br />HOURLY EQUIPMENT COST <br />Cost Bre <br />uipment Description <br />Shift basis : 1 per day <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />% Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA 0 NA <br />Ownerhip cost/hour : $109.89 NA NA NA $41.68 $24.58 <br />Operating cost/hour : $163.34 NA NA NA $11.56 $8.33 <br />Ripper op. cost/hour : NA NA NA NA $0.00 NA <br />Operator cost/hour : $24.98 NA NA NA $24.50 $38.70 <br />Unit subtotals : $298.21 NA NA NA $77.75 $71.60 <br />Number of units : 2 0 0 0 1 1 <br />Group subtotals : Work : $596.43 Support: $0.00 Maintenance : $149.35 <br />Total work team cost/hour : $745.77 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 25,145 CCY factor <br />Source of quantity take-off :Map 5C-6A and 8A-? <br />Source of estimated swell factor : CAT Handbook <br />Loose <br />1.165 volume : 29,294 LCY