Laserfiche WebLink
HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : <br />Material weight : 2,900 pounds/LCY <br />Material description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Rated payload : 75,000 pounds <br />Payload capacity: 25.86 LCY <br />Scraper Bowl (volume) Basis : <br />sheet 2 of 2 <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity: 25.86 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 7,100 <br /> Scraper Push dozer Source <br />Scraper loading time 1.00 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirtAt. surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 600 12.00 3.00 15.00 589 1.03 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />minutes <br />travel time for each segment is adjusted for acceleration/deceleration. Return time <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 1,039.49 LCY/hour *** Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) <br />Unit cost : $0.864 /LCY <br /> <br />0.36 minutes <br />2.99 minutes <br />862.78 LCY/hour <br />2 scraper(s) <br />862.78 LCY/hour <br />862.78 LCY/hour <br />Total job time : 49.50 <br />Total job cost: $36 0 17 <br />Hours <br />Haul time : 1.03 <br />Return route