My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-24_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2011-01-24_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:19 PM
Creation date
4/1/2011 9:05:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
1/24/2011
Doc Name
Cost Summary
Section_Exhibit Name
Reclamation Cost Estimate MR126
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 1 Mine C-81-038 2010 Midterm Review MT-06 <br />Task: 000 Site: Bowie No. 1 Mine Date: 3 Dec 10 User: JRS <br />Permit Action: 2010 Midterm Review (MT-6) County Delta <br />Description: Cost Summary File Name: C-1981-038 <br /> <br />Task Reclamation Task Description Hours Direct Cost <br /> <br />068 -Finish Grade Waste Disposal Area 6.15 $715.00 <br />069 -Finish Grade ROM Storage Area 4.61 $537.00 <br /> <br />074 -Recut Haul Road Ditches 3.59 $495.00 <br />075 -Construct 2730' of 3' Ditches 6.21 $856.00 <br />076 -Construct 4340' of 12' Ditches 35.96 $4,995.00 <br />078 -Backfill OVM Pipeline Removal Trench 0.97 $991.00 <br />079 -Establish Irrigation Ditch at Storage and Loadout 1.71 $236.00 <br />081 -Riprap Placement 4.04 $13,064.00 <br /> <br />085 -Backfill and Regrade Pond 1 3.05 $614.00 <br />086 -Backfill and Regrade Pond 2 2.47 $499.00 <br />087 -Backfill and Regrade Pond 3 2.52 $509.00 <br />088 -Backfill and Regrade Pond 4 2.91 $588.00 <br />089 -Remove Concrete Pond Dams 10.77 $1,484.00 <br />091 -Backfill and Regrade Waste Pile Pond 2.31 $465.00 <br />092 -Backfill and Regrade Timber Storage Pond 2.83 $570.00 <br />093 -Backfill and Regrade Coal Stockpile Pond 1.00 $202.00 <br />095 -Backfill and Regrade Pond W- 1 2.88 $580.00 <br />096 -Backfill and Regrade Pond W-2 2.88 $580.00 <br /> <br />100 -Replace Topsoil from Stockpile to Waste Disposal Area 4.89 $5,020.00 <br />101 -Move Fill Topsoil Pile into Stockpiled Area 25.75 $26,433.00 <br />102 -Replace Topsoil from Stockpile to OVWM 47.66 $48,915.00 <br />103 -Replace Topsoil from Stockpile to Replaced Fill 11.49 $11,795.00 <br />104 -Replace Topsoil from Stockpile to OVWM Vent Shaft Access 2.84 $2,918.00 <br />105 -Haul Stevens Gulch Topsoil to OVM 5.94 $10,365.00 <br />106 -Redistribute Topsoil at Truck Dump Station 0.44 $456.00 <br />107 -Replace Topsoil from Stockpile to OVM Main Diversion Ditch 0.44 $550.00 <br />108 -Replace Topsoil from Stockpile to Remaining Mine Site 12.71 $20,264.00 <br />109 -Replace Topsoil from OVWM Slide Area 0.30 $310.00 <br />110 Replace Topsoil from Stockpile to Drill Pads 1.45 $1,484.00 <br />111 Replace Topsoil from Stockpile to Light-Use Roads to Drill Pads 4.45 $4,567.00 <br />112 -Replace Topsoil from Stockpile to Pond W- 1 1.15 $294.00 <br />113 -Replace Topsoil from Stockpile to Pond W-2 1.15 $294.00 <br /> <br />118 -Seal OWM and OVWM Vent Shafts 120.00 $64,387.00 <br />125 -Plug and Seal All Boreholes 177.00 $75,766.00 <br /> <br />130 -Revegetate OVM 20.00 $36,767.00 <br />131 -Revegetate OVWM 24.44 $44,930.00 <br />132 -Revegetate Remainder of Mine Site 95.68 $74,688.00 <br />133 -Revegetate Narrowed Haul Road Outslope 6.76 $12,427.00 <br /> <br />137 -Demolish and Remove All Structures 400.00 $266,819.00 <br /> <br />Summary Sheet Page 2 of 3
The URL can be used to link to this page
Your browser does not support the video tag.