Laserfiche WebLink
Bowie No. 1 Mine C-81-038 2010 Midterm Review MT-06 <br />Task: 000 Site: Bowie No. 1 Mine Date: 3 Dec 10 User: JRS <br />Permit Action: 2010 Midterm Review (MT-6) County Delta <br />Description: Cost Summary File Name: C-1981-038 <br /> <br />Task Reclamation Task Description Hours Direct Cost <br /> <br />001 -Push Fill from Zone 1-A to Zone 4-A at C&S Bench 197.83 $203,056.00 <br />002 -Push Fill from Substation Zone 1-D to Road Cut Zone 2-D 0.35 $360.00 <br />003 -Push Fill from Substation Zone 1-D to Road Cut Zone 2-E 0.63 $648.00 <br />004 -Push Fill from Outslope Zone 2-B to Portal Zone 4-C 0.10 $102.00 <br />005 -Push Fill from Zone 1-C to Water Tank Bench Zone 3-C 83.04 $85,228.00 <br />006 -Push Fill from Highwall Zone 4-D to Portal Zone 4-C 2.74 $2,807.00 <br />007 -Push Fill from East Highwall Zone 4-D to West Zone 4-D 1.93 $1,978.00 <br />008 -Haul Fill from C&S Zone 1-A to Portal Zone 4-C 121.03 $213,048.00 <br />009 -Haul Fill from Storage Zone 1 -B to Road Cut Zone 2-C 0.83 $1,034.00 <br />010 -Haul Fill from Storage Zone 1-B to Portal Zone 4-C 7.71 $13,646.00 <br />011 -Haul Fill from ROM Area to Portal Zone 4-C 25.81 $45,021.00 <br />012 -Haul Fill from ROM Area to Diversion Zones 3-A, 3-B and 3-C 284.28 $493,854.00 <br />013 -Haul Fill from Storage Zone 1-B to Warehouse Zone 2-A 49.50 $36,917.00 <br />014 -Haul Fill from Storage Zone 1-B to Coal Zone 4-B 31.49 $23,482.00 <br />015 -Haul Fill from Zone 1-E to Zone 2-D 0.34 $254.00 <br />016 -Haul Fill from Zone 1-D to Zone 4-C 3.22 $2,401.00 <br />017 -Backfill Orchard Valley West Mine 24.09 $24,727.00 <br />019 Regrade Drill Pads from MR-124 and 125 and TR-38, 49 and 50 14.15 $3,631.00 <br /> <br />025 -Place Four Feet of Cover Material on Waste Disposal Area 4.27 $6,569.00 <br />026 -Remove Temporary Waste Pile to Waste Disposal Area 2.61 $3,690.00 <br />027 -Haul Footprint of Coal and Mine Stockpiles to Refuse Area 5.68 $7,013.00 <br /> <br />032 -Compact Waste Pile 92.54 $14,915.00 <br />033 -Compact OVWM Road Backfill 25.34 $4,084.00 <br />034 -Compact Zones 2-A, C, D and E; 3-A, B and C; 4-A, B and C 434.52 $70,031.00 <br /> <br />038 -Rip Cut Zones 1-A, B, C, D and E, 2-B; 4-D 27.72 $28,796.00 <br />041 -Rip Roads 0.12 $126.00 <br /> <br />045 -Remove Gravel on Roads to Ponds 3 and 4 2.19 $1,631.00 <br />049 -Regrade OVWM Light Access Road 4.38 $604.00 <br />050 -Regrade Timber Storage Access Road 8.36 $1,153.00 <br />052 -Regrade Old Waste Disposal Road 8.36 $1,153.00 <br />053 -Regrade West Ridge Disposal Area 4.18 $576.00 <br />054 -Finish Grade Lower Waste Disposal Road 0.08 $9.00 <br />055 -Rip Outer 22'of Asphalt Haul Road 0.10 $102.00 <br />056 -Haul Asphalt from Haul Road to Portal Bench Zone 4-C 1.90 $3,037.00 <br />057 -Rip Outslope of Haul Road 0.22 $233.00 <br />058 -Excavate Haul Road Outslope and Place at Toe 19.49 $2,686.00 <br />059 Regrade Light-Use Roads from MR-125 and TR-38, 49 and 50 18.81 $19,304.00 <br /> <br />063 -Finish Grade All Reclamation Zones (1-4) 23.78 $2,766.00 <br />064 -Finish Grade Upper Waste Disposal Road 0.22 $25.00 <br />065 -Finish Grade Crushing and Screening Road 0.08 $9.00 <br />066 -Finish Grade OVWM 2.10 $244.00 <br />Summary Sheet Page 1 of 3