Laserfiche WebLink
User: <br />JRS <br />Site Bowie No. 1 Mine Filename :CO38 -253 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Revision 04 <br />Task description Regrade Light-Use Roads - Credit <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D9R - 9SU (2005) <br />Horsepower: <br />405 <br />Blade type Semi- Universal <br />Attachment no. 1 : ROPS Cab <br />Shift basis : <br />1 per day <br />Attachment no. 2: 3-shank ripper <br />Data source: <br />(CRG) <br />Utilization % <br />Cost Breakdown: <br />Ownership cost/hour : $67.77 <br />NA <br />Operating cost/hour : $95.29 <br />100 <br />Ripper op. cost/hour : $0.00 <br />0 <br />Operator cost/hour : $38.54 <br />NA <br />Total unit cost/hour : $201.60 Total fleet cost/hour : <br />$201.60 <br />MATERIAL QUANTITIES <br />Initial <br />Swell Loose <br />volume: 6,000 BCY factor: 1.250 volume : <br />7,500 <br />LCY <br />Source of estimated volume Division Estimate <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) _ <br />Average push distance : <br />150 feet <br />Material consistency : <br />0.90 <br />(Cat HB) _ <br />Unadjusted hourly production : <br />910.5 LCY /hr <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />_( avg.) <br />Material consistency description : <br />Job efficiency: <br />0.83 <br />(1shi <br />C ompacted fill or embankment <br />Spoil pile: <br />0.80 <br />(fnd - rf) <br />Push gradient: <br />0.90 <br />(Cat HB) <br />Average push gradient: <br />5.00 % (pos) <br />Altitude : <br />0.95 <br />( Cat HB) <br />Average site altitude : <br />8,100 feet <br />Material weight: <br />0.87 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Material weight: <br />2,650 Ibs /LCY <br />Net correction : <br />0.33 <br />Weight description : <br />Decom posed rock - 25% Rock, 75% Earth <br />Adjusted unit production : <br />303.92 <br />LCY /hr <br />Adjusted fleet production : <br />303.92 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />1 Dozer(s) Total job time: <br />24.68 <br />Hours <br />Unit cost: <br />$0.663 /LCY Total job cost: <br />$4,975 <br />